Jump to main content.
Minnesota Department of Transportation

511 Travel Info

Water Table Diagram
 

MnPAVE

Open Standpipe Installation Photos
[an error occurred while processing this directive]
 

Quick Links

LRRB Investigation 828

 

State Aid

 

MEPDG (NCHRP 1-37A)

 

FHWA Pavements

 

MnROAD

 

Pavement Design

 

Pavement Management

 

Research

 

Seasonal Load Limits

 

Materials Manuals

Concrete

 

Laboratory

 

Pavement Design

 

Related Resources

Construction Tools

 

Audit

 

MnDOT Spec Book

 

Special Provisions

 

Technical Memorandums

 

Maps

 

For more information contact: Ruth Roberson or John Siekmeier

 
Open standpipe installed at top of subgrade

Open standpipe
installed at top of
subgrade

Standpipe extends 14 feet below top of subgrade

Standpipe extends
14 feet below top
of subgrade

PVC (90 degree angle) secures sensors

PVC (90 degree angle)
secures sensors
 

Coaxial cable and pressure transducer

Coaxial cable and
pressure transducer
 

Standpipe is sealed

Standpipe is sealed
 
 

Cables will be trenched

Cables will be trenched