Engineering process | Planning | Cost-Effectiveness Policy
Benefit-Cost Analysis/Cost-Effectiveness Policy prepared statements
There is no specific prepared statement for the cost-effectiveness evaluation. Summarize and report the results of the analysis in the "Evaluation of Alternatives" section of the environmental document and include a statement that the project manager has the full analysis available.