Route (Hwy or Interstate) Description Begin date End date Total cost 2025 construction cost Website
Hwy 12 Resurface and repair Hwy 12 from Litchfield to Darwin; upgrade sidewalks to improve accessibility; replace culverts July 2024 October 2025 $9.5 million  $4.45 million  mndot.gov/d8/projects/hwy12litchtocokato
Hwy 14 Repair slope on Hwy 14 in Balaton near Lake Yankton August 2025 August 2025 $400,000  $400,000  None
Hwy 19 Reconstruct Hwy 19 from Marlene Street through Bruce Street intersection in Marshall; install roundabout at Country Club Drive; install EV charging station at Avera parking lot; upgrade sidewalks and ramps May 2025 October 2026 $26.9 million  $13 million  mndot.gov/d8/projects/hwy19marshall
Hwy 23 Construct left-turn lane on Hwy 23 at CR 1, northeast of Raymond April 2025 July 2025 $1.34 million  $1.34 million  mndot.gov/d8/projects/hwy23raymond-hwy71svea
Hwy 23 Install trees along Hwy 23 from CR 6 in Hawick to Paynesville October 2024 June 2025 1.5 million  $855,000 mndot.gov/d8/projects/hwy23southgap
Hwy 23 Resurface two bridges on Hwy 23, 43 and 61 miles north of Hwy 19 in Marshall May 2025 October 2025 $1.7 million  $1.7 million  mndot.gov/d8/projects/hwy23greenvalley
Hwy 23, Hwy 71 Resurface SB lane of Hwy 71 from south end of Hwy 23 bypass to the Business 71 split in Willmar; resurface Hwy 23 from CR 5 to start of Hwy 23 bypass in Willmar August 2025 November 2025 $21 million  $400,000 mndot.gov/d8/projects/hwy71-23willmar
Hwy 40 Construct left- and right-turn lanes between CR 55 and CR 5 in Willmar July 2025 August 2025 $1.12 million  $1.12 million  mndot.gov/d8/projects/hwy40willmar
Hwy 52 Improve or replace four pedestrian bridges statewide, and improve accessibility. Locations include the bridges spanning Hwy 212 from DeSoto Ave to 5th St E in Glencoe; Hwy 52 from Lewis St to Stickney Ave in South St Paul; I-35E from Pleasant Ave to Thompson St in St Paul; I-35 between Michigan Ave and Railroad St in Duluth April 2025 October 2026 $11.2 million $6 million None
Hwy 67 Install lighting at Hwy 67 and CR 6 and at Hwy 67 and CR 21 May 2025 May 2025 $90,000 $90,000 mndot.gov/d8/projects/hwy67granitefallstoecho
Hwy 71 Install left-turn lane on Hwy 71 at Kandiyohi CR 3 in Svea April 2025 July 2025 $1.3 million  $1.3 million  mndot.gov/d8/projects/hwy23raymond-hwy71svea
Hwy 212 Install traffic crossovers on Hwy 212 1 mile west of CR 9 near Plato in preparation for a future bridge replacement project August 2025 October 2025 $290,000 $290,000 mndot.gov/d8/projects/hwy212plato
Various roads in MnDOT District 8 Repair culverts on multiple highways districtwide May 2025 October 2025 $4.4 million  $4.4 million  mndot.gov/d8/projects/districtwide-culverts
Various roads in MnDOT District 8 Perform bridge maintenance on multiple bridges districtwide July 2025 August 2025 $200,000 $200,000 None
Various roads in MnDOT District 8 Install centerline rumble strips on multiple concrete roadways districtwide August 2025 September 2025 $1.9 million  $1.9 million  None
Various roads in MnDOT District 8 Install striping  on multiple highways districtwide June 2025 October 2026 $570,000 $570,000 None