Corridor Study
\A final layout was created upon the recommendation from a completed corridor study in 2019. The layout shown below includes a roundabout at Center St and Sixth St SW. They would improve safety at the intersections and reduce motorist speeds on the corridor.

Project benefits
- Traffic calming and natural speed reduction for traffic
- Improved motorist and pedestrian safety
- Improved pedestrian accessibility
- Drainage improvements to eliminate standing stormwater
- Maintenance of the roadsides
- Roundabout lighting will improve safety and comfort of pedestrians and vehicles
- Improved access and operations of the multi-use trail on the west side of the highway
- Improved land use, maintenance efficiency and aesthetics
- Improvements of highway frontage greenspace
- Improved comfort to drivers accessing Hwy 89 from side streets and private approaches due to flatter inclines.