About this project
In 2024, we will replace the signal system at the intersection of Hwy 169 and Co. Rd. 3/Excelsior Blvd. in Hopkins. Crews will also construct a center median on Excelsior Blvd. The signals are over 25 years old and need to be replaced to meet current design standards.
Summary of work
- Replace signals at Hwy 169 ramps to/from Excelsior Blvd.
- Construct center median
Traffic impacts
All traffic impacts are tentative and weather dependent.
Upcoming
Information about upcoming traffic impacts will be posted as details become available. Motorists can expect lane closures on Excelsior Blvd. during construction. Crews will first close the ramps to/from NB Hwy 169 and Excelsior Blvd. then will close the ramps to/from SB Hwy 169 and Excelsior Blvd. These ramp closures will last approximately six weeks each.