About this project

Hwy 3 project location map.
In 2025, we will construct a roundabout at the intersection of Hwy 3 and 142nd St. to improve safety, reduce delays and enhance the overall operations at the entrance to the Rosemount High School. In addition to adding the roundabout crews will also be adding drainage and re-aligning the bike/pedestrian crosswalks to include pedestrian access at the roundabout.
Summary of work
- Construct new roundabout at 142nd St.
- Add drainage
- Improve accessibility at the trail/sidewalk