Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.

Last updated October 2024

Score Route  Year Planned (FY) Description High Level Cost Estimate for Planning Purposes  Comments
85 Hwy 48 Not Selected Resurface Hwy 48 from just east of I-35 to Pine County Road 21  $4,800,000 Corridor study in progress
81 Hwy 23 Not Selected Resurface Hwy 23 from Boyd St to I-35  $2,300,000 Cost is greater than available budget
79 Hwy 23 2030 Resurface Hwy 23 from 0.4 miles east of Pine/Carlton County line to St. Louis River $8,300,000 0901-81
77 Hwy 73 2025-2026 Resurface Hwy 73 from 0.4 miles South of Johnson Rd to Hwy 1 $13,800,000 6930-41
76 Hwy 1 2029 Resurface Hwy 1 from Hwy 53 to Hwy 169 $10,650,000 6902-28
76 Hwy 135 2028-2029 Resurface Hwy 135 from just north of the Embarrass River to Hwy 1 $7,900,000 6913-38
76 Hwy 23 Not Selected Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line  $10,900,000 Cost is greater than available budget
76 Hwy 45 2032 Resurface Hwy 45 from Hwy 210 in Carlton to I-35 $2,933,000 0910-34
76 Hwy 73 Not Selected Resurface Hwy 73 from just north of CR 86 to Hwy 2  $4,800,000 Cost is greater than available budget
75 Hwy 23 Not Selected Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave  $3,400,000 Cost is greater than available budget; also scored as urban project
74 Hwy 169 2027-2028 Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd) $3,901,000 3809-09
74 Hwy 39 Not Selected Resurface Hwy 39 from Hwy 23 to Hwy /WI state line  $700,000 2019 project
74 Hwy 73 2034 Resurface Hwy 73 from 13th St NW in Chisholm to just south of Johnson Road $5,774,000 6930-1124106
73 Hwy 11 2032 Resurface Hwy 11 from just east of CR 23 to end of Hwy 11 $5,042,000 3606-68
73 Hwy 73 Not Selected Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129  $5,700,000 NA
71 Hwy 1 2033 Resurface Hwy 1 from east of Hwy 38 in Effie to just north of Bass Lake Campground Rd $8,280,000 3101-1124104
71 Hwy 73 2032 Resurface Hwy 73 from bridge over West Swan River to Hwy 169 in Hibbing $6,673,000 9261-1124103
70 Hwy 1 2032 Resurface Hwy 1 from Salveson Rd to Hwy 61 $3,734,000 3803-35
69 Hwy 48 Not Selected Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line  $7,300,000  
67 Hwy 1 Not Selected Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County road 38  $300,000 NA
67 Hwy 73 2033 Resurface Hwy 73 from 1st Ave in Floodwood to just north of CR 191  $3,613,000 6928-31
66 Hwy 1 Not Selected Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River  $300,000 NA
66 Hwy 27 2034 Resurface Hwy 27 from Aitkin-Carlton County line to Hwy 73 $14,300,000 0902-1124105
66 Hwy 73 Not Selected Resurface Hwy 73 from I-35 to just north of the Moose Horn River  $7,000,000  
65 Hwy 1 Not Selected Resurface Hwy 1 from just west of St Louis County Road 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd  $7,500,000 NA
64 Hwy 38 2029 Resurface Hwy 38 from just north of S Jct CR 49 to just north of CR 19 and from 0.9 miles south of CR 262 to Newburg Bay Rd $4,360,000 3108-86
63 Hwy 38 Not Selected Resurface Hwy 38 from just north of Itasca County Road 19 to south limits of Bigfork  $12,700,000 NA
62 Hwy 1 Not Selected Resurface Hwy 1 from New Tomahawk Rd to Isabella/NFD-172  $1,800,000 NA
62 Hwy 70 2033 Resurface Hwy 70 from CR 61 to just east of CR 61 $500,000 5811-14
60 Hwy 65 2031 Resurface Hwy 65 from Hwy 169 to just north of Hawkins Ave in Nashwauk $775,000 3112-38
56 Hwy 1 Not Selected Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River  $7,800,000 NA
47 Hwy 1 Not Selected Resurface Hwy 1 from just north of the Kawishiwi River to just west of T-273  $3,400,000 NA
45 Hwy 73 Not Selected Resurface Hwy 73 from  just north of the Moose Horn River to Hwy 27  $200,000 NA
40 Hwy 27 Not Selected Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61  $400,000 NA
27 Hwy 123 Not Selected Resurface Hwy 123 from Pine County Road 30 to Hwy 23  $1,400,000 NA
18 Hwy 37 Not Selected Repair Hwy 37 concrete pavement from Hwy 169 to just east of Iron Jct Rd  $100,000 NA
18 Hwy 38 Not Selected Resurface Hwy 38 from Hwy 2 to 17th St NW  $400,000 NA

Previous years

Score Route  Year Planned (FY) Description High Level Cost Estimate for Planning Purposes  Comments
87 Hwy 47 2024 Resurface Hwy 47 from 305th Lane/TWP 86 to Jct US 169 in Aitkin $2,000,000 0108-30M D3
85 Hwy 48 Not Selected Resurface Hwy 48 from just east of I-35 to Pine County Road 21  $4,800,000 Future corridor study
81 Hwy 23 Not Selected Resurface Hwy 23 from Boyd St to I-35  $2,300,000 Cost is greater than available budget
79 Hwy 23 2030 Resurface Hwy 23 from 0.4 miles east of Pine/Carlton County line to St. Louis River $8,300,000 0901-81
79 Hwy 73 Not Selected Resurface Hwy 73 from West Swan River bridge to Hwy 169  $7,000,000 Cost is greater than available budget
77 Hwy 73 2026 Resurface Hwy 73 from 0.4 miles South of Johnson Rd to Hwy 1 and replace bridges over the Sturgeon River and Little Fork River
$21,100,000 6930-41
76 Hwy 1 2029 Resurface Hwy 1 from Hwy 53 to Hwy 169 $7,136,000 6902-28
76 Hwy 135 2028 Resurface Hwy 135 from just north of the Embarrass River to Hwy 1 $6,900,000 6913-38
76 Hwy 23 2024 Resurface Hwy 23 from Sandstone to Askov and repair bridge over I35 and intersection lighting at Jct of Hwy 18 and CR 61 $4,421,000 5809-16
76 Hwy 23 Not Selected Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line  $10,900,000 Cost is greater than available budget
76 Hwy 45 2032 Resurface Hwy 45 from Hwy 210 in Carlton to I-35 $2,933,000 0910-34
76 Hwy 73 Not Selected Resurface Hwy 73 from just north of CR 86 to Hwy 2  $4,800,000 NA
75 Hwy 23 Not Selected Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave  $3,400,000 Cost is greater than available budget; also scored as urban project
74 Hwy 169 2027-2028 Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd)
$5,901,000 3809-09; 3809-1109863
74 Hwy 39 Not Selected Resurface Hwy 39 from Hwy 23 to Hwy /WI state line  $700,000 2019 project
73 Hwy 11 2032 Resurface Hwy 11 from just east of CR 23 to end of Hwy 11 $5,042,000 3606-68
73 Hwy 73 Not Selected Resurface Hwy 73 from 13th St NW to NFD 111  $5,600,000 NA
73 Hwy 73 Not Selected Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129  $5,700,000 NA
70 Hwy 1 2032 Resurface Hwy 1 from Salveson Rd to Hwy 61 $3,734,000 3803-35
69 Hwy 48 Not Selected Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line  $7,300,000 NA
67 Hwy 1 Not Selected Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County road 38  $300,000 NA
66 Hwy 1 Not Selected Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River  $300,000 NA
66 Hwy 73 Not Selected Resurface Hwy 73 from I-35 to just north of the Moose Horn River  $7,000,000 NA
65 Hwy 1 Not Selected Resurface Hwy 1 from just west of St Louis County Road 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd  $7,500,000 NA
64 Hwy 38 2029 Resurface Hwy 38 from just north of S Jct CR 49 to just north of CR 19 and from 0.9 miles south of CR 262 to Newburg Bay Rd $4,360,000 3108-86
63 Hwy 38 Not Selected Resurface Hwy 38 from just north of Itasca County Road 19 to south limits of Bigfork  $12,700,000 NA
62 Hwy 1 Not Selected Resurface Hwy 1 from New Tomahawk Rd to Isabella/NFD-172  $1,800,000 NA
62 Hwy 70 2033 Resurface Hwy 70 from CR 61 to just east of CR 61
$500,000 5811-14
60 Hwy 65 2031 Resurface Hwy 65 from Hwy 169 to just north of Hawkins Ave in Nashwauk $775,000 3112-38
56 Hwy 1 Not Selected Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River  $7,800,000 NA
47 Hwy 1 Not Selected Resurface Hwy 1 from just north of the Kawishiwi River to just west of T-273  $3,400,000 NA
45 Hwy 73 Not Selected Resurface Hwy 73 from  just north of the Moose Horn River to Hwy 27  $200,000 NA
40 Hwy 27 Not Selected Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61  $400,000 NA
27 Hwy 123 Not Selected Resurface Hwy 123 from Pine County Road 30 to Hwy 23  $1,400,000 NA
18 Hwy 37 Not Selected Repair Hwy 37 concrete pavement from Hwy 169 to just east of Iron Jct Rd  $100,000 NA
18 Hwy 38 Not Selected Resurface Hwy 38 from Hwy 2 to 17th St NW  $400,000 NA

Score Route  Year Planned (FY) Description High Level Cost Estimate for Planning Purposes  Comments
92 Hwy 23 2023 Hwy 23 in Duluth from0.20 miles East of 121st St to Jct Hwy 39, . Resurface Roadway $2,500,000 6910-105
86 Hwy 194 2022 Resurface Hwy 194 from Hwy 2 to Hwy 53  $3,900,000 NA
85 Hwy 48 Not Selected Resurface Hwy 48 from just east of I-35 to Pine County Road 21  $4,800,000 Future corridor study
83 Hwy 1, Hwy 169 2024 Hwy 1 West Jct Hwy 169 to jct Hwy 135 in Tower., and Hwy 169 from Pike River to Hwy 1. Resurface Roadway. $3,400,000 6903-17
81 Hwy 23 Not Selected Resurface Hwy 23 from Boyd St to I-35  $2,300,000 Cost is greater than available budget
79 Hwy 23 2030 Resurface Hwy 23 from 0.4 miles east of Pine/Carlton County line to St. Louis River $8,300,000 0901-81
79 Hwy 73 Not Selected Resurface Hwy 73 from West Swan River bridge to Hwy 169  $7,000,000 Cost is greater than available budget
77 Hwy 73 2026-2027 Resurface Hwy 73 from 0.4 miles South of Johnson Rd to Hwy 1 and replace bridges over the Sturgeon River and Little Fork River $17,060,000 6930-41
76 Hwy 1 2028 Resurface Hwy 1 from Hwy 53 to Hwy 169 $6,896,000 6902-28
76 Hwy 135 2028 Resurface Hwy 135 from just south of CR 21 to Hwy 1 $5,170,000 6913-38
76 Hwy 23 2024 Resurface Hwy 23 from Sandstone to Askov and intersection lighting at Jct of Hwy 18 and CR 61 $4,420,000 5809-16
76 Hwy 23 Not Selected Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line  $10,900,000 Cost is greater than available budget
76 Hwy 45 2031 Resurface Hwy 45 from Hwy 210 in Carlton to I-35 $2,824,000 0910-34
76 Hwy 73 Not Selected Resurface Hwy 73 from just north of CR 86 to Hwy 2  $4,800,000 NA
75 Hwy 1 2023 Resurface Highway 1 from 0.5 miles North of Bass Lake Rd to Highway 65. $5,868,420 3101-38/3101-39
75 Hwy 23 Not Selected Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave  $3,400,000 Cost is greater than available budget; also scored as urban project
74 Hwy 169 2027-2028 Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd) $4,000,000 3809-09
73 Hwy 11 2032 Resurface Hwy 11 from just east of CR 23 to end of Hwy 11 $5,042,000 3606-68
73 Hwy 73 Not Selected Resurface Hwy 73 from 13th St NW to NFD 111  $5,600,000 NA
73 Hwy 73 Not Selected Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129  $5,700,000 NA
70 Hwy 1 2032 Resurface Hwy 1 from Salveson Rd to Hwy 61 $3,734,000 3803-35
69 Hwy 48 Not Selected Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line  $7,300,000 NA
68 Hwy 65 2024 Highway 65 from North Jct Highway 27 to East Jct Highway 210. Resurface Roadway $2,800,000 0111-27
67 Hwy 1 Not Selected Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County road 38  $300,000 NA
67 Hwy 73 2029 Resurface Hwy 73 from 1st Ave to just north of CR 191 in Floodwood $2,351,000 6928-1038389
66 Hwy 1 Not Selected Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River  $300,000 NA
66 Hwy 73 Not Selected Resurface Hwy 73 from I-35 to just north of the Moose Horn River  $7,000,000 NA
65 Hwy 1 Not Selected Resurface Hwy 1 from just west of St Louis County Road 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd  $7,500,000 NA
64 Hwy 38 2028 Resurface Hwy 38 from just north of CR 49 to just north of CR 19 and from 0.9 miles south of CR 262 to Newburg Bay Rd $4,213,000 3108-86
63 Hwy 38 Not Selected Resurface Hwy 38 from just north of Itasca County Road 19 to south limits of Bigfork  $12,700,000 NA
62 Hwy 1 Not Selected Resurface Hwy 1 from New Tomahawk Rd to Isabella/NFD-172  $1,800,000 NA
62 Hwy 70 2031 Resurface Hwy 70 from CR 61 to just east of CR 61 $500,000 5811-14
60 Hwy 65 2031 Resurface Hwy 65 from Hwy 169 to just north of Hawkins Ave in Nashwauk $775,000 3112-38
56 Hwy 1 Not Selected Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River  $7,800,000 NA
47 Hwy 1 Not Selected Resurface Hwy 1 from just north of the Kawishiwi River to just west of T-273  $3,400,000 NA
45 Hwy 73 Not Selected Resurface Hwy 73 from  just north of the Moose Horn River to Hwy 27  $200,000 NA
40 Hwy 27 Not Selected Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61  $400,000 NA
27 Hwy 123 Not Selected Resurface Hwy 123 from Pine County Road 30 to Hwy 23  $1,400,000 NA
18 Hwy 37 Not Selected Repair Hwy 37 concrete pavement from Hwy 169 to just east of Iron Jct Rd  $100,000 NA
18 Hwy 38 Not Selected Resurface Hwy 38 from Hwy 2 to 17th St NW  $400,000 NA

 

Score Route  Description  High-Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
92 Hwy 23 Resurface Hwy 23 in Duluth from 5th ST W. to Hwy 39.   $2,100,000 2023 6910-105
86 Hwy 194 Resurface Hwy 194 from Hwy 2 to Hwy 53  $3,900,000 Not Selected Cost is greater than available budget
85 Hwy 23 Resurface Hwy 23 from McCuen St to Becks Rd/St. Louis County Road 3  $3,300,000 2031 Scored as urban, but scores higher as Non-NHS project. 6910-113
85 Hwy 48 Resurface Hwy 48 from just east of I-35 to Pine County Road 21  $4,800,000 Not Selected Preventive maintenance planned for 2022 to improve/extend life until later programming
83 Hwy 1 Hwy 1 West Jct Hwy 169 to jct Hwy 135 in Tower., and Hwy 169 from Pike River to Hwy 1. Resurface Roadway.  $3,400,000 2023 6903-17
81 Hwy 73 Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm  $4,400,000 2026 Scored as urban project; listed as one project in CHIP; 6930-42
81 Hwy 23 Resurface Hwy 23 from Boyd St to I-35  $2,300,000 Not Selected Cost is greater than available budget
79 Hwy 73 Resurface Hwy 73 from West Swan River bridge to Hwy 169  $7,000,000 Not Selected Cost is greater than available budget
79 Hwy 23 Resurface Highway 23 from just east of Pine/Carlton County line to St Louis River bridge  $8,300,000 2030 0901-81
79 Hwy 210 Resurface Hwy 210 from the end of the 4-lane to just south of Vermillion St  $3,300,000 2030 Scored as urban, but scores higher as Non-NHS project; 0916-1038046
78 Hwy 169 Resurface Hwy 1 West Jct Hwy 169 to jct Hwy 135 in Tower., and Hwy 169 from Pike River to Hwy 1.   $3,400,000 2023 Combined with other project, now under 6903-17
77 Hwy 73 Resurface Hwy 73 from Johnson Rd to Hwy 1 and replace bridges over the Sturgeon River and Little Fork River  $17,070,000 2026 6930-41; includes two bridge replacements
76 Hwy 73 Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm  $4,400,000 2026 Scored as urban project; listed as one project in CHIP; 6930-42
76 Hwy 73 Resurface Hwy 73 from just north of CR 86 to Hwy 2  $4,800,000 Not Selected Preventive maintenance planned for 2022 to improve/extend life until later programming
76 Hwy 23 Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line  $10,900,000 Not Selected Cost is greater than available budget
76 Hwy 23 Resurface Hwy 23 from Sandstone to Askov and intersection lighting at Jct of Hwy 18 and Pine County Road 61  $4,200,000 2024 Selected prior to policy (in 2019-2028 CHIP); 5809-16
76 Hwy 135 Resurface Hwy 135 from just north of the Embarrass River to Hwy 1  $5,200,000 2028 6913-1039090
76 Hwy 45 Resurface Hwy 45 from Hwy 210 to I-35  $1,700,000 2031 0910-34
76 Hwy 1 Resurface Hwy 1 from Hwy 53 to Hwy 169  $6,900,000 2028 6902-1038565
75 Hwy 1 Resurface Highway 1 from 0.5 miles North of Bass Lake Rd to Highway 65.  $6,300,000 2023 Exempt (in 2019-2022 STIP); 3101-38
75 Hwy 65 Resurface highway from N. jct Highway 1 to .5 mi. s. Koochiching County Highway 8
 $11,100,000 2022 Exempt (in 2019-2022 STIP); 3609-42
75 Hwy 23 Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave  $3,400,000 Not Selected Cost is greater than available budget; also scored as urban project
74 Hwy 39 Resurface Hwy 39 from Hwy 23 to Hwy /WI state line  $700,000 Not Selected NA
74 Hwy 169 Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd)  $3,800,000 2027 3809-09
73 Hwy 73 Resurface Hwy 73 from 13th St NW to NFD 111  $5,600,000 Not Selected NA
73 Hwy 73 Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129  $5,700,000 Not Selected NA
69 Hwy 18 Resurface Hwy 18 in Finlayson to Hwy 23  $4,100,000 2031 Scored as urban project; 5808-1038045 
69 Hwy 48 Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line  $7,300,000 Not Selected NA
68 Hwy 65 Resurface Hwy 65 from North Jct Hwy 27 to East Jct Hwy 210.

 $2,700,000 2024 0111-27
67 Hwy 1 Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County road 38  $300,000 Not Selected NA
67 Hwy 73 Resurface Hwy 73 from 1st Ave to just north of St. Louis County Road 191 in Floodwood  $2,400,000 2029 6928-1038389
66 Hwy 1 Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River  $300,000 Not Selected NA
66 Hwy 73 Resurface Hwy 73 from I-35 to just north of the Moose Horn River  $7,000,000 Not Selected NA
66 Hwy 38 Hwy 38 South Limits Big Fork to 0.3 miles South Itasca County Road 14, Resurface roadway, sidewalks, improve pedestrian access  $2,500,000 2023 Scored as urban project; 3108-83
65 Hwy 1 Resurface Hwy 1 from just west of St Louis County Road 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd  $7,500,000 Not Selected NA
64 Hwy 38 Resurface Hwy 38 from just north of CR 49 to just north of CR 19 and from 0.9 miles south of CR 262 to Newburg Bay Rd     $4,400,000 2028 Selected prior to policy (in 2019-2028 CHIP) 3108-86
63 Hwy 38 Resurface Hwy 38 from just north of Itasca County Road 19 to south limits of Bigfork  $12,700,000 Not Selected NA
62 Hwy 1 Resurface Hwy 1 from New Tomahawk Rd to Isabella/NFD-172  $1,800,000 Not Selected NA
62 Hwy 1 Resurface Hwy 1 from Salveson Rd to Hwy 61  $16,700,000 Not Selected NA
62 Hwy 70 Resurface Hwy 70 from Pine County Road 61 to just east of Pine County Road 61  $500,000 2031 5811-14; Other needs in the area under consideration (District 1 Freight Plan)
61 Hwy 65 Resurface Hwy 65 from Hwy 169 NB to Hawkins Ave in Nashwauk  $500,000 Not Selected NA
57 Hwy 11 Resurface Hwy 11 from just east of West Island View Rd to the end of Hwy 11  $1,300,000 Not Selected NA
56 Hwy 1 Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River  $7,800,000 Not Selected NA
55 Hwy 73 Resurface Hwy 73 from Hwy 27 to 3rd Ave  $3,000,000 2029 Scored as urban project; 0912-1038575
47 Hwy 1 Resurface Hwy 1 from just north of the Kawishiwi River to just west of T-273  $3,400,000 Not Selected NA
45 Hwy 73 Resurface Hwy 73 from  just north of the Moose Horn River to Hwy 27  $200,000 Not Selected NA
40 Hwy 73 Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm  $4,400,000 2026 Scored as urban project; listed as one project in CHIP; 6930-42
40 Hwy 27 Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61  $400,000 Not Selected NA
29 Hwy 217 Resurface Hwy 217 in Littlefork  $3,200,000 2030 Scored as urban project; 3614-24
27 Hwy 123 Resurface Hwy 123 from Pine County Road 30 to Hwy 23  $1,400,000 Not Selected NA
18 Hwy 37 Repair Hwy 37 concrete pavement from Hwy 169 to just east of Iron Jct Rd  $100,000 Not Selected NA
18 Hwy 38 Resurface Hwy 38 from Hwy 2 to 17th St NW  $400,000 Not Selected NA
15 Hwy 210 Resurface Hwy 210 from just south of Vermillion St to Hwy 23  $2,700,000 Not Selected NA

Score Route  Description  High-Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
88 Hwy 37 Resurface highway from State Highway 53 to State Highway 135 through Gilbert.
$6,500,000 2021 NA
86 Hwy 45 Resurface Hwy 45 from Hwy 210 to I-35 $800,000 Not Selected Not a district priority. Will continue to monitor pavement performance
85 Hwy 23 Resurface Hwy 23 from McCuen St to Becks Rd/Pipestone County Road 3 $3,000,000 2029 Scored as urban, but scores higher as Non-NHS project
85 Hwy 135 Resurface Hwy 135 from Hwy 53 to just north of the Embarrass River $4,800,000 Not Selected On the ground conditions do not match RQI prediction.
83 Hwy 1 Hwy 1 West Jct Hwy 169 to jct Hwy 135 in Tower. Resurface Roadway.

$2,300,000 2023 NA
81 Hwy 27 Resurface highway from State Highway 65 to Aitkin/Carlton County Line
$5,000,000 2022 NA
81 Hwy 194 Resurface Hwy 194 from Hwy 2 to Hwy 53 $2,000,000 Not Selected Not a district priority. Will continue to monitor pavement performance
78 Hwy 73 Resurface Hwy 73 from West Swan River bridge to Hwy 169 $3,500,000 Not Selected Not a district priority. Will continue to monitor pavement performance
78 Hwy 169 Resurface Hwy 169 from Pike River to Hwy 1

$1,600,000 2024 NA
78 Hwy 23 Resurface Highway 23 from just east of Pine/Carlton County line to St Louis River bridge $8,400,000 2030 NA
78 Hwy 210 Resurface Hwy 210 from the end of the 4-lane to just south of Vermillion St $2,900,000 2028 Scored as urban, but scores higher as Non-NHS project
77 Hwy 73 Resurface Hwy 73 from National Forest Road 111 to Hwy 1 $15,400,000 2026 NA
76 Hwy 1 Resurface Hwy 1 from Hwy 53 to Hwy 169 $6,900,000 2028 NA
75 Hwy 1 Resurface the highway from the east junction of Highway 65 to the north junction of Highway 53 in Itasca County and  on Hwy 73 from the junction of Highway 1 to the junction of Highway 53 and Rehab bridge#69106  in St. Louis County $7,800,000 2021 Selected prior to policy (in 2019-2022 STIP), listed as one project in STIP
75 Hwy 1 Resurface highway from N. Bass Lake Rd to .7 mi. S County Rd 550 and State Highway 1 from 0.1 MI South.Township Rd-551 Thistledew Lake Campground Rd to East. JCT State Highway 65 resurface the roadway. $7,500,000 2023 Listed as two projects in the STIP
75 Hwy 65 Resurface highway from N. jct Highway 1 to .5 mi. s. Koochiching County Highway 8
$11,700,000 2022 Selected prior to policy (in 2019-2022 STIP)
74 Hwy 169 Resurface Hwy 169 from Hidden Valley Rd to Lake County Road 18 (Power Dam Rd) $3,400,000 2026 NA
74 Hwy 18 Resurface Hwy 18 from west limits of Finlayson to Hwy 23 $1,100,000 Not Selected Not a district priority. Will continue to monitor pavement performance
73 Hwy 65 Hwy 65 from North Jct Hwy 27 to East Jct Hwy 210. Resurface Roadway

$3,600,000 2024 NA
73 Hwy 73 Resurface Hwy 73 from Hwy 2 to West Swan River bridge $3,700,000 Not Selected Not a district priority. Will continue to monitor pavement performance
73 Hwy 73 Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129 $2,900,000 Not Selected Not a district priority. Will continue to monitor pavement performance
73 Hwy 37 Resurface Hwy 37 from Hwy 169 to just east of Iron Jct Rd $700,000 Not Selected Not a district priority. Will continue to monitor pavement performance
72 Hwy 65 Resurface Hwy 65 from Hwy 169 NB to Hawkins Ave in Nashwauk $300,000 Not Selected Not a district priority. Will continue to monitor pavement performance
72 Hwy 73 Resurface Hwy 73 from 13th St NW to National Forest Road 111 $2,800,000 Not Selected Not a district priority. Will continue to monitor pavement performance
92 Hwy 23 Hwy 23 in Duluth from 5TH ST W. to Hwy 39. Resurface Roadway  $1,000,000 2023 Selected prior to policy (in 2019-2022 STIP)
72 Hwy 70 Resurface Hwy 70 from Hwy 361 to just east of Hwy 361 $200,000 Not Selected Not a district priority. Will continue to monitor pavement performance
71 Hwy 1 Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River $3,900,000 Not Selected Not a district priority. Will continue to monitor pavement performance
71 Hwy 73 Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $2,200,000 2026 Scored as urban
71 Hwy 73 Resurface Hwy 73 from just north of Saint Louis County Road 86 to Hwy 2 $2,400,000 Not Selected Not a district priority. Will continue to monitor pavement performance
70 Hwy 1 Resurface Hwy 1 from Salveson Rd to Hwy 61 $2,600,000 Not Selected Not a district priority. Will continue to monitor pavement performance
70 Hwy 1 Resurface Hwy 1 from New Tomahawk Rd to Isabella/National Forest Road-172 $4,800,000 Not Selected Not a district priority. Will continue to monitor pavement performance
70 Hwy 65 Resurface highway from Koochiching County Highway 8 to State Highway 71
$4,200,000 2021 Selected prior to policy (in 2019-2022 STIP)
69 Hwy 48 Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line $3,700,000 Not Selected NA
67 Hwy 1 Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River $300,000 2029 NA
67 Hwy 11 Resurface Hwy 11 from just east of West Island View Rd to the end of Hwy 11 $1,200,000 2026 Selected prior to policy (in 2019-2028 CHIP)
66 Hwy 73 Resurface Hwy 73 from I-35 to just north of the Moose Horn River $3,600,000 Not Selected NA
66 Hwy 169 Resurface Hwy 169 from just south of Saint Louis County Road 26 to just southwest of Hwy 1 $400,000 Not Selected NA
66 Hwy 6 Resurface Hwy 6 from just south of RP 133 to Hwy 71 $5,400,000 Not Selected NA
65 Hwy 1 Resurface Hwy 1 from just west of CR 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd $6,600,000 Not Selected NA
65 Hwy 73 Resurface the highway from the east junction of Highway 65 to the north junction of Highway 53 in Itasca County and  on Hwy 73 from the junction of Highway 1 to the junction of Highway 53 and Rehab bridge#69106  in St. Louis County $1,000,000 2021 Selected Prior to policy (in 2019-2022 STIP), listed as one project in STIP
65 Hwy 123 Resurface highway drainage improvements & pedestrian access improvements in Sandstone.
$3,400,000 2021 Selected prior to policy (in 2019-2022 STIP)
65 Hwy 38 Resurface Hwy 38 from just south of CR 14 to Hwy 1/Itasca County Road 5 $1,700,000 Not Selected NA
64 Hwy 65 Resurface Hwy 65 from 1.4 miles south of Sandy River to Hwy 200 $4,500,000 Not Selected NA
64 Hwy 38 Resurface Hwy 38 from 0.9 miles south of Itasca County Road 262 to Newburg Bay Rd $1,000,000 2025 Selected prior to policy (in 2019-2028 CHIP)
64 Hwy 135 Resurface Hwy 135 from just north of the Embarrass River to Hwy 1 $4,800,000 2027 Selected prior to policy (in 2019-2028 CHIP)
63 Hwy 73 Resurface Hwy 73 from 1st Ave to just north of Saint Louis County Road 191 in Floodwood $2,300,000 2029 Selected prior to policy (in 2019-2028 CHIP)
63 Hwy 73 Resurface Hwy 73 from north of Carlton County Road 129 to Hwy 210 $2,000,000 Not Selected NA
62 Hwy 23 Resurface Hwy 23 from Sandstone to Askov and intersection lighting at Jct of Hwy 18 and Pine County Road 61 $3,800,000 2024 Selected prior to policy (in 2019-2028 CHIP)
61 Hwy 1 Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County Road 38 $200,000 Not Selected NA
59 Hwy 38 Resurface Hwy 38 from just north of Itasca County Road 49 to just north of Itasca County Road 19 $2,800,000 2025 Smaller repair selected while longer term funding is secured for reconstruction
57 Hwy 1 Resurface Hwy 1 from just north of the Kawishiwi River to just west of Stony River Township Road-273 $1,700,000 Not Selected NA
56 Hwy 38 Hwy 38 South Limits Bigfork to 0.3 miles South Itasca County Road 14 Resurface roadway sidewalks improve pedestrian access

$2,600,000 2023 Scored as urban project
50 Hwy 73 Resurface Hwy 73 from  just north of the Moose Horn River to Hwy 27 $100,000 Not Selected NA
45 Hwy 27 Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61 $200,000 Not Selected NA
42 Hwy 73 Resurface Hwy 73 from where Hwy 73 turns left to 13th St NW $1,800,000 2026 Scored as urban
40 Hwy 73 Concrete pavement repair on Hwy 73 from 4th St in Chisholm to where Hwy 73 turns left $600,000 2026 Scored as urban
40 Hwy 38 Resurface Hwy 38 from Hwy 2 to 17th St NW $200,000 Not Selected NA
33 Hwy 39 Resurface Hwy 39 from Hwy 23 to Hwy /WI state line $400,000 Not Selected NA
30 Hwy 73 Resurface Hwy 73 from Hwy 27 to 3rd Ave $2,800,000 2028 Scored as urban
29 Hwy 65 Resurface Hwy 65 from just south of Aitkin County Road 2 to Hwy 27 $2,100,000 Not Selected NA
29 Hwy 217 Resurface Hwy 217 in Littlefork $2,600,000 2025 Scored as urban project
27 Hwy 123 Resurface Hwy 123 from Pine County Road 30 to Hwy 23 $700,000 Not Selected NA
25 Hwy 48 Resurface Hwy 48 from just east of I-35 to Pine County Road 21 $200,000 Not Selected NA
24 Hwy 65 Resurface Hwy 65 from Hwy 210 to 1.4 miles south of Sandy River $200,000 Not Selected NA
23 Hwy 11 Resurface Hwy 11 from just east of Koochiching County Road 332 to just east of Koochiching County Road 23 $200,000 Not Selected NA
22 Hwy 23 Resurface Hwy 23 from Boyd St to I-35 $200,000 Not Selected NA
18 Hwy 38 Resurface Hwy 38 from 1.1 miles north of Hwy 2 to just north of Itasca County Road 49 $200,000 Not Selected NA
17 Hwy 65 Resurface Hwy 65 from Hawkins Ave in Nashwauk to Hwy 1 $200,000 Not Selected NA
17 Hwy 11 Resurface Hwy 11 from Hwy 53 to just east of Koochiching County Road 332 $200,000 Not Selected NA
17 Hwy 11 Resurface Hwy 11 from just east of Koochiching County Road 23 to .8 miles west of Island View Circle $200,000 Not Selected NA
17 Hwy 18 Resurface Hwy 18 from Hwy 47 to west limits of Finlayson $200,000 Not Selected NA
17 Hwy 70 Resurface Hwy 70 from Hwy 107 to Hwy 361 $200,000 Not Selected NA
15 Hwy 210 Resurface Hwy 210 from just south of Vermillion St to Hwy 23 $1,400,000 Not Selected NA
14 Hwy 73 Resurface Hwy 73 from Hwy 210 to Carlton/St Louis County Line $200,000 Not Selected NA
12 Hwy 200 Resurface Hwy 200 from Hwy 65 to Hwy 2 $200,000 Not Selected NA
11 Hwy 23 Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line $200,000 Not Selected NA
10 Hwy 217 Resurface Hwy 217 from Front St to Hwy 53 $200,000 Not Selected NA
9 Hwy 200 Resurface Hwy 200 from Hwy 169 in Hill City to Hwy 65 $200,000 Not Selected Chip seal being scheduled
4 Hwy 6 Resurface Hwy 6 from Hwy 1 to just north of Hwy 1 $200,000 Not Selected NA
1 Hwy 289 Resurface Hwy 289 from Hwy 73 to end of Hwy 289 $200,000 Not Selected NA

 

Score Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
92 Hwy 23 Reclaim and overlay from St Louis Bridge to Highway 39 $2,200,000 2023 NA
91 US2 Major concrete rehabilitation from reference point 260 to I-35 $800,000 Not Selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
90 Hwy 73 Full mill and replace from Moose Horn River to Highway 27 $400,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
89 Hwy 37 Medium mill and overlay from Highway 53 to 135 $2,800,000 2020 NA
87 US2 /Hwy 6 Medium mill and overlay in multiple locations in Itasca county $1,700,000 2020 NA
83 Hwy 1 Medium mill and overlay from Highway 169 to Cedar St  $2,800,000 2023 NA
83 Hwy 1/US169 Medium mill and overlay in multiple locations in St. Louis County $1,100,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
82 Hwy 48 Medium mill and overlay from east of I-35 to Pine County Highway 21 $6,000,000 2029 NA
81 Hwy 27 Medium mill and overlay from Highway 65 to Kenwood ave $5,400,000 2022 NA
81 Hwy 73 Full mill and replace from I-35 to Moose Horn Rver $1,300,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
80 Hwy 169 Medium mill and overlay from Highway 53 to Reference Point 381 $4,700,000 2020 NA
79 Hwy 135 Reconstruction from railroad crossing to St. Louis County Road 4 $10,000,000 2020 NA
79 Hwy 11 Medium mill and overlay from Highway 53 to Highway 332 $400,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
78 Hwy 23 Medium mill and overlay from Pine/Carlton County Line to St Louis River Br $10,500,000 2023 NA
78 Hwy 169 Medium mill and overlay from Pike River to junction with Highway 1 $2,000,000 2024 NA
78 Hwy 46 Reclaim and overlay from Itasca County Highway 13 to Koochiching County Highway 40 $7,800,000 2025 NA
78 Hwy 46 Reclaim and overlay from Itasca County Highway 39 to Itasca County Highway 13 $28,000,000 2028 NA
78 Hwy 38 Medium mill and overlay from 17th St to Itasca County Highway 49 $3,700,000 2029 NA
78 Hwy 11 Medium mill and overlay from Highway 332 to Koochiching County Road 20 $1,500,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
78 Hwy 65 Medium mill and overlay from Hawkins ave to Highway 1 $16,000,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
78 Hwy 169 Medium mill and overlay from reference post 381 to 1100 feet south of Highway 1 $900,000 Not Selected NA
77 Hwy 73 Reclaim and overlay from National Forest Route 111 to Highway 1  $22,000,000 2026 Selected prior to policy (in 2019-2028 CHIP)
77 Hwy 23 Medium mill and overlay from Highway 39 to Becks Rd $700,000 Not Selected NA
77 Hwy 73 Reclaim and overlay at Highway 169/Dillon Rd $7,400,000 Not Selected NA
77 Hwy 48 Reconstruction from I-35 overpass to Morris Ave $2,400,000 Not Selected NA
77 Hwy 70 Medium mill and overlay from Highway 107 to Highway 361 $4,800,000 Not Selected NA
76 Hwy 1 Medium mill and overlay from Highway 65 to Highway 53 $7,400,000 2020 Selected prior to policy (in 2019-2022 STIP)
76 Hwy 1 Medium mill and overlay from Highway 53 to Highway 169 $9,800,000 2026 Selected prior to policy (in 2019-2028 CHIP)
75 Hwy 65 Reclaim and overlay from Highway 1 to Koochiching County Highway 9 $24,000,000 2022 Selected prior to policy (in 2019-2022 STIP)
75 Hwy 1 Reclaim and overlay from Reference point 198 to Reference point 207 $4,600,000 2023 Selected prior to policy (in 2019-2022 STIP)
75 Hwy 1 Reclaim and overlay from Reference point 207 to Highway 65 $4,700,000 2023 Selected prior to policy (in 2019-2022 STIP)
75 Hwy 45 Medium mill and overlay from Highway 210 to I-35 $1,800,000 2026 Selected prior to policy (in 2019-2028 CHIP)
75 Hwy 1 Medium mill and overlay from 5th St to Highway 6 $16,000,000 2027 Selected prior to policy (in 2019-2028 CHIP)
74 Hwy 169 Thick mill and overlay from Hidden Valley Rd to Lake County Highway 18/Power Dam Rd $2,500,000 2024 Selected prior to policy (in 2019-2028 CHIP)
74 Hwy 18 Medium mill and overlay from Finlayson to Pine County Highway 61 $1,600,000 2029 Selected prior to policy (in 2019-2028 CHIP), also listed as an Urban Pavement Project
74 Hwy 70 Medium mill and overlay from Highway 361 to 0.3 miles east of Highway 361 $200,000 Not Selected NA
73 Hwy 1 Medium Mill and overlay from Highway 169 to Kawishiwi River $5,300,000 Not Selected NA
73 Hwy 37 Medium mill and overlay from Highway 169 to Iron Jct Rd $1,100,000 Not Selected NA
73 Hwy 73 Reclaim and overlay from 3rd Ave to Carlton County Road 129 $5,900,000 Not Selected NA
73 Hwy 217 Medium mill and overlay from Front St to Highway 53 $8,600,000 Not Selected NA
72 Hwy 47 Medium mill and overlay from Aitkin County Road 80 to South of 305th Ave $3,200,000 2023 Selected prior to policy (in 2019-2022 STIP)
72 Hwy 6 Medium mill and overlay from Highway 286 to Highway 1 $7,000,000 2028 Selected prior to policy (in 2019-2028 CHIP)
72 Hwy 73 Reclaim and overlay from 13th St NW to south of Frider Rd near Chisholm $5,600,000 Not Selected NA
70 Hwy 65 Medium mill and overlay from Highway 200 to Highway 169 $6,800,000 2020 Selected prior to policy (in 2019-2022 STIP)
70 Hwy 65 Medium mill and overlay from Koochiching County Highway 8 to Highway 71 $6,000,000 2021 Selected prior to policy (in 2019-2022 STIP)
70 Hwy 1 Full mill and replace from Salveson Road to Highway 61 $4,600,000 Not Selected NA
70 US2 Reclaim and overlay from Floodwood to St. Louis County Road 845 $9,100,000 Not Selected NA
69 Hwy 200 Medium mill and overlay from Highway 169 to Highway 65 $9,200,000 2024 Selected prior to policy (in 2019-2028 CHIP)
69 Hwy 1 Medium mill and overlay from Beltrami/Koochiching County line to Highway 71 $2,500,000 2029 Selected prior to policy (in 2019-2028 CHIP)
69 Hwy 210 Medium mill and overlay from I-35 to Vermillion St $4,800,000 2029 Selected prior to policy (in 2019-2028 CHIP), Also listed as urban pavement project
69 Hwy 11 Medium mill and overlay from US/Canada Border to Koochiching County Road 83 $8,900,000 Not Selected NA
69 Hwy 48 Medium mill and overlay from Pine County Highway 21 to Minnesota/Wisconsin State Line $7,300,000 Not Selected NA
68 Hwy 11 Medium mill and overlay from Reference post 167 to Koochiching County Rd 82 $4,400,000 Not Selected NA
68 Hwy 11 Medium mill and overlay from Bigfork River Bridge to Highway 71 $3,000,000 Not Selected NA
67 Hwy 11 Medium mill and overlay from Island View City limits to Dove Island $1,600,000 2026 Selected prior to policy (in 2019-2028 CHIP)
67 Hwy 1 Medium mill and overlay from 0.2 miles north of Kawishiwi River to 0.2 miles south of Kawishiwi River $400,000 2028 Selected prior to policy (in 2019-2028 CHIP)
66 Hwy 123 Reclaim and overlay from Highway 23 to Pine County Highway 30 $2,300,000 2021 Selected prior to policy (in 2019-2022 STIP)
66 Hwy 217 Reconstruction from Highway 65 to Front St $1,200,000 2025 Selected prior to policy (in 2019-2028 CHIP), also listed as an Urban Pavement Project
66 Hwy 11 Medium mill and overlay from Koochiching County Road 82 to Bigfork River bridge $2,400,000 Not Selected NA
66 Hwy 210 Medium mill and overlay from Vermillion St to Highway 23 $4,000,000 Not Selected NA
65 Hwy 73 Medium mill and overlay from Highway 1 to Highway 53 $1,900,000 2020 Selected prior to policy (in 2019-2022 STIP)
65 Hwy 1 Reclaim and overlay from Highway 71 to Highway 46 $300,000 2025 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 1 Reclaim and overlay from Itasca County Highway 38 to 0.5 miles north of Bass Lake Rd $7,200,000 2029 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 11 Medium mill and overlay from just west of McCloud Creek to 1 mile west of Koochiching County Road 4 $900,000 2029 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 11 Medium mill and overlay from Koochiching County Road 83 to 1 mile east of Koochiching County Road 83 $700,000 2029 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 27 Reconstruction from Kenwood Ave to Carlton County Highway 61 $6,300,000 Not Selected NA
64 Hwy 38 Medium mill and overlay from 0.9 miles south of Itasca County Road 262 to Newburg Bay Rd $1,400,000 2025 Selected prior to policy (in 2019-2028 CHIP)
64 Hwy 135 Medium mill and overlay from just north of Embarrass River to Highway 1 $8,300,000 2025 Selected prior to policy (in 2019-2028 CHIP)
64 Hwy 73 Medium mill and overlay from Highway 210 reference post 25 $3,100,000 Not Selected NA
63 Hwy 73 Medium mill and overlay from Floodwood to Saint Louis County Road 191 $3,200,000 2025 Selected prior to policy (in 2019-2028 CHIP)
63 Hwy 47 Medium mill and overlay from 305th Ln to Highway 169 $9,100,000 2029 Selected prior to policy (in 2019-2028 CHIP)
63 Hwy 1 Medium mill and overlay from Tomahawk Rd to Lake County Highway 2 $2,600,000 Not Selected NA
62 Hwy 65 Medium mill and overlay from north of Aitkin County Road 27 to Highway 210 $4,500,000 2023 Selected prior to policy (in 2019-2028 CHIP)
62 Hwy 23 Medium overlay from Highway 18 to Main St in Askov $4,900,000 2024 Selected prior to policy (in 2019-2028 CHIP)
62 Hwy 18 Medium mill and overlay from Highway 169 to Highway 47 $7,400,000 2024 Selected prior to policy (in 2019-2028 CHIP)
62 Hwy 6 Medium mill and overlay at Highway 1 to .24 miles north Highway 1 $1,400,000 Not Selected NA
61 Hwy 73 Medium mill and overlay from Saint Louis County Road 86 to Highway 2 $6,100,000 2025 Selected prior to policy (in 2019-2028 CHIP)
61 Hwy 47 Medium mill and overlay from Mille Lacs/Aitkin County line to Aitkin County Road 80 $4,700,000 2029 Selected prior to policy (in 2019-2028 CHIP)
60 Hwy 1 Thick mill and overlay from Highway 38 to Itasca County Highway 38 $300,000 Not Selected NA
59 Hwy 38 Medium mill and overlay from Itasca County Highway 49 to Itasca County Highway 19 $3,800,000 2025 Smaller repair selected while longer term funding is secured for reconstruction
58 Hwy 6 Medium mill and overlay from Bigfork River Bridge to Highway 1 $4,800,000 2028 Smaller repair selected while longer term funding is secured for reconstruction
57 Hwy 6 Reclaim and overlay from Cass/Itasca County line to Highway 2 $5,700,000 2021 Selected prior to policy (in 2019-2022 STIP)
57 Hwy 107 Medium mill and overlay from Kanabec/Pine Co line to Highway 23 $6,700,000 2027 Smaller repair selected while longer term funding is secured for reconstruction
57 Hwy 1 Reclaim and overlay from Kawishiwi River to National Forest Road 553 $3,400,000 Not Selected NA
55 Hwy 38 Medium mill and overlay from Itasca County Highway 14 to Highway 1 $4,300,000 2027 Smaller repair selected while longer term funding is secured for reconstruction
54 Hwy 38 Full mill and replace from Big Fork to Highway 38  $600,000 2023 Selected prior to policy (in 2019-2022 STIP), also listed as Urban Pavement project
51 Hwy 289 Full mill and replace from Highway 73 to Highway 289 $400,000 Not Selected NA
44 Hwy 194 Medium mill and overlay from Highway 2 to Highway 53 $3,000,000 2022 Selected prior to policy (in 2019-2022 STIP)
42 Hwy 65 Medium mill and overlay from Highway 210 to Sandy River $6,100,000 Not Selected NA
37 Hwy 200 Thin mill and overlay from Highway 65 to Highway 2 $3,200,000 Not Selected NA
36 Hwy 6 Medium mill and overlay from reference post 93 to Itasca County Road 136 $5,000,000 2028 District 2 construction district funded project
36 Hwy 200 Medium mill and overlay from Cass/Aitkin County line to Highway 169 $4,100,000 Not Selected NA
32 Hwy 6 Medium mill and overlay from Itasca County Road 136 to Highway 286 $2,900,000 2020 Selected prior to policy (in 2019-2022 STIP)
29 Hwy 11 Medium mill and overlay from Koochiching County line to reference post 146 $7,100,000 Not Selected NA
27 Hwy 123 Thin mill and overlay from Pine County Highway 30 to Highway 23 $1,400,000 Not Selected NA
25 Hwy 11 Medium mill and overlay from reference Town Road 129 to US/Canada Border $1,000,000 2029 Ongong maintenance concerns
25 Hwy 73 Medium mill and overlay from Highway 27 to 3rd Ave $1,900,000 2029 District anticipates the pavement condition will deteriorate faster than the model is projecting. Also listed as an urban pavement project