Non-National Highway System pavement projects
MnDOT District 1
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- District 1 project selection
- District 1 National Highway System pavement projects
- District 1 Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.
Last updated October 2024
Score | Route | Year Planned (FY) | Description | High Level Cost Estimate for Planning Purposes | Comments |
85 | Hwy 48 | Not Selected | Resurface Hwy 48 from just east of I-35 to Pine County Road 21 | $4,800,000 | Corridor study in progress |
81 | Hwy 23 | Not Selected | Resurface Hwy 23 from Boyd St to I-35 | $2,300,000 | Cost is greater than available budget |
79 | Hwy 23 | 2030 | Resurface Hwy 23 from 0.4 miles east of Pine/Carlton County line to St. Louis River | $8,300,000 | 0901-81 |
77 | Hwy 73 | 2025-2026 | Resurface Hwy 73 from 0.4 miles South of Johnson Rd to Hwy 1 | $13,800,000 | 6930-41 |
76 | Hwy 1 | 2029 | Resurface Hwy 1 from Hwy 53 to Hwy 169 | $10,650,000 | 6902-28 |
76 | Hwy 135 | 2028-2029 | Resurface Hwy 135 from just north of the Embarrass River to Hwy 1 | $7,900,000 | 6913-38 |
76 | Hwy 23 | Not Selected | Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line | $10,900,000 | Cost is greater than available budget |
76 | Hwy 45 | 2032 | Resurface Hwy 45 from Hwy 210 in Carlton to I-35 | $2,933,000 | 0910-34 |
76 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of CR 86 to Hwy 2 | $4,800,000 | Cost is greater than available budget |
75 | Hwy 23 | Not Selected | Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave | $3,400,000 | Cost is greater than available budget; also scored as urban project |
74 | Hwy 169 | 2027-2028 | Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd) | $3,901,000 | 3809-09 |
74 | Hwy 39 | Not Selected | Resurface Hwy 39 from Hwy 23 to Hwy /WI state line | $700,000 | 2019 project |
74 | Hwy 73 | 2034 | Resurface Hwy 73 from 13th St NW in Chisholm to just south of Johnson Road | $5,774,000 | 6930-1124106 |
73 | Hwy 11 | 2032 | Resurface Hwy 11 from just east of CR 23 to end of Hwy 11 | $5,042,000 | 3606-68 |
73 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129 | $5,700,000 | NA |
71 | Hwy 1 | 2033 | Resurface Hwy 1 from east of Hwy 38 in Effie to just north of Bass Lake Campground Rd | $8,280,000 | 3101-1124104 |
71 | Hwy 73 | 2032 | Resurface Hwy 73 from bridge over West Swan River to Hwy 169 in Hibbing | $6,673,000 | 9261-1124103 |
70 | Hwy 1 | 2032 | Resurface Hwy 1 from Salveson Rd to Hwy 61 | $3,734,000 | 3803-35 |
69 | Hwy 48 | Not Selected | Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line | $7,300,000 | |
67 | Hwy 1 | Not Selected | Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County road 38 | $300,000 | NA |
67 | Hwy 73 | 2033 | Resurface Hwy 73 from 1st Ave in Floodwood to just north of CR 191 | $3,613,000 | 6928-31 |
66 | Hwy 1 | Not Selected | Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River | $300,000 | NA |
66 | Hwy 27 | 2034 | Resurface Hwy 27 from Aitkin-Carlton County line to Hwy 73 | $14,300,000 | 0902-1124105 |
66 | Hwy 73 | Not Selected | Resurface Hwy 73 from I-35 to just north of the Moose Horn River | $7,000,000 | |
65 | Hwy 1 | Not Selected | Resurface Hwy 1 from just west of St Louis County Road 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd | $7,500,000 | NA |
64 | Hwy 38 | 2029 | Resurface Hwy 38 from just north of S Jct CR 49 to just north of CR 19 and from 0.9 miles south of CR 262 to Newburg Bay Rd | $4,360,000 | 3108-86 |
63 | Hwy 38 | Not Selected | Resurface Hwy 38 from just north of Itasca County Road 19 to south limits of Bigfork | $12,700,000 | NA |
62 | Hwy 1 | Not Selected | Resurface Hwy 1 from New Tomahawk Rd to Isabella/NFD-172 | $1,800,000 | NA |
62 | Hwy 70 | 2033 | Resurface Hwy 70 from CR 61 to just east of CR 61 | $500,000 | 5811-14 |
60 | Hwy 65 | 2031 | Resurface Hwy 65 from Hwy 169 to just north of Hawkins Ave in Nashwauk | $775,000 | 3112-38 |
56 | Hwy 1 | Not Selected | Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River | $7,800,000 | NA |
47 | Hwy 1 | Not Selected | Resurface Hwy 1 from just north of the Kawishiwi River to just west of T-273 | $3,400,000 | NA |
45 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of the Moose Horn River to Hwy 27 | $200,000 | NA |
40 | Hwy 27 | Not Selected | Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61 | $400,000 | NA |
27 | Hwy 123 | Not Selected | Resurface Hwy 123 from Pine County Road 30 to Hwy 23 | $1,400,000 | NA |
18 | Hwy 37 | Not Selected | Repair Hwy 37 concrete pavement from Hwy 169 to just east of Iron Jct Rd | $100,000 | NA |
18 | Hwy 38 | Not Selected | Resurface Hwy 38 from Hwy 2 to 17th St NW | $400,000 | NA |
Previous years
Score | Route | Year Planned (FY) | Description | High Level Cost Estimate for Planning Purposes | Comments |
87 | Hwy 47 | 2024 | Resurface Hwy 47 from 305th Lane/TWP 86 to Jct US 169 in Aitkin | $2,000,000 | 0108-30M D3 |
85 | Hwy 48 | Not Selected | Resurface Hwy 48 from just east of I-35 to Pine County Road 21 | $4,800,000 | Future corridor study |
81 | Hwy 23 | Not Selected | Resurface Hwy 23 from Boyd St to I-35 | $2,300,000 | Cost is greater than available budget |
79 | Hwy 23 | 2030 | Resurface Hwy 23 from 0.4 miles east of Pine/Carlton County line to St. Louis River | $8,300,000 | 0901-81 |
79 | Hwy 73 | Not Selected | Resurface Hwy 73 from West Swan River bridge to Hwy 169 | $7,000,000 | Cost is greater than available budget |
77 | Hwy 73 | 2026 | Resurface Hwy 73 from 0.4 miles South of Johnson Rd to Hwy 1 and replace bridges over the Sturgeon River and Little Fork River |
$21,100,000 | 6930-41 |
76 | Hwy 1 | 2029 | Resurface Hwy 1 from Hwy 53 to Hwy 169 | $7,136,000 | 6902-28 |
76 | Hwy 135 | 2028 | Resurface Hwy 135 from just north of the Embarrass River to Hwy 1 | $6,900,000 | 6913-38 |
76 | Hwy 23 | 2024 | Resurface Hwy 23 from Sandstone to Askov and repair bridge over I35 and intersection lighting at Jct of Hwy 18 and CR 61 | $4,421,000 | 5809-16 |
76 | Hwy 23 | Not Selected | Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line | $10,900,000 | Cost is greater than available budget |
76 | Hwy 45 | 2032 | Resurface Hwy 45 from Hwy 210 in Carlton to I-35 | $2,933,000 | 0910-34 |
76 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of CR 86 to Hwy 2 | $4,800,000 | NA |
75 | Hwy 23 | Not Selected | Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave | $3,400,000 | Cost is greater than available budget; also scored as urban project |
74 | Hwy 169 | 2027-2028 | Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd) |
$5,901,000 | 3809-09; 3809-1109863 |
74 | Hwy 39 | Not Selected | Resurface Hwy 39 from Hwy 23 to Hwy /WI state line | $700,000 | 2019 project |
73 | Hwy 11 | 2032 | Resurface Hwy 11 from just east of CR 23 to end of Hwy 11 | $5,042,000 | 3606-68 |
73 | Hwy 73 | Not Selected | Resurface Hwy 73 from 13th St NW to NFD 111 | $5,600,000 | NA |
73 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129 | $5,700,000 | NA |
70 | Hwy 1 | 2032 | Resurface Hwy 1 from Salveson Rd to Hwy 61 | $3,734,000 | 3803-35 |
69 | Hwy 48 | Not Selected | Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line | $7,300,000 | NA |
67 | Hwy 1 | Not Selected | Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County road 38 | $300,000 | NA |
66 | Hwy 1 | Not Selected | Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River | $300,000 | NA |
66 | Hwy 73 | Not Selected | Resurface Hwy 73 from I-35 to just north of the Moose Horn River | $7,000,000 | NA |
65 | Hwy 1 | Not Selected | Resurface Hwy 1 from just west of St Louis County Road 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd | $7,500,000 | NA |
64 | Hwy 38 | 2029 | Resurface Hwy 38 from just north of S Jct CR 49 to just north of CR 19 and from 0.9 miles south of CR 262 to Newburg Bay Rd | $4,360,000 | 3108-86 |
63 | Hwy 38 | Not Selected | Resurface Hwy 38 from just north of Itasca County Road 19 to south limits of Bigfork | $12,700,000 | NA |
62 | Hwy 1 | Not Selected | Resurface Hwy 1 from New Tomahawk Rd to Isabella/NFD-172 | $1,800,000 | NA |
62 | Hwy 70 | 2033 | Resurface Hwy 70 from CR 61 to just east of CR 61 |
$500,000 | 5811-14 |
60 | Hwy 65 | 2031 | Resurface Hwy 65 from Hwy 169 to just north of Hawkins Ave in Nashwauk | $775,000 | 3112-38 |
56 | Hwy 1 | Not Selected | Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River | $7,800,000 | NA |
47 | Hwy 1 | Not Selected | Resurface Hwy 1 from just north of the Kawishiwi River to just west of T-273 | $3,400,000 | NA |
45 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of the Moose Horn River to Hwy 27 | $200,000 | NA |
40 | Hwy 27 | Not Selected | Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61 | $400,000 | NA |
27 | Hwy 123 | Not Selected | Resurface Hwy 123 from Pine County Road 30 to Hwy 23 | $1,400,000 | NA |
18 | Hwy 37 | Not Selected | Repair Hwy 37 concrete pavement from Hwy 169 to just east of Iron Jct Rd | $100,000 | NA |
18 | Hwy 38 | Not Selected | Resurface Hwy 38 from Hwy 2 to 17th St NW | $400,000 | NA |
Score | Route | Year Planned (FY) | Description | High Level Cost Estimate for Planning Purposes | Comments |
92 | Hwy 23 | 2023 | Hwy 23 in Duluth from0.20 miles East of 121st St to Jct Hwy 39, . Resurface Roadway | $2,500,000 | 6910-105 |
86 | Hwy 194 | 2022 | Resurface Hwy 194 from Hwy 2 to Hwy 53 | $3,900,000 | NA |
85 | Hwy 48 | Not Selected | Resurface Hwy 48 from just east of I-35 to Pine County Road 21 | $4,800,000 | Future corridor study |
83 | Hwy 1, Hwy 169 | 2024 | Hwy 1 West Jct Hwy 169 to jct Hwy 135 in Tower., and Hwy 169 from Pike River to Hwy 1. Resurface Roadway. | $3,400,000 | 6903-17 |
81 | Hwy 23 | Not Selected | Resurface Hwy 23 from Boyd St to I-35 | $2,300,000 | Cost is greater than available budget |
79 | Hwy 23 | 2030 | Resurface Hwy 23 from 0.4 miles east of Pine/Carlton County line to St. Louis River | $8,300,000 | 0901-81 |
79 | Hwy 73 | Not Selected | Resurface Hwy 73 from West Swan River bridge to Hwy 169 | $7,000,000 | Cost is greater than available budget |
77 | Hwy 73 | 2026-2027 | Resurface Hwy 73 from 0.4 miles South of Johnson Rd to Hwy 1 and replace bridges over the Sturgeon River and Little Fork River | $17,060,000 | 6930-41 |
76 | Hwy 1 | 2028 | Resurface Hwy 1 from Hwy 53 to Hwy 169 | $6,896,000 | 6902-28 |
76 | Hwy 135 | 2028 | Resurface Hwy 135 from just south of CR 21 to Hwy 1 | $5,170,000 | 6913-38 |
76 | Hwy 23 | 2024 | Resurface Hwy 23 from Sandstone to Askov and intersection lighting at Jct of Hwy 18 and CR 61 | $4,420,000 | 5809-16 |
76 | Hwy 23 | Not Selected | Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line | $10,900,000 | Cost is greater than available budget |
76 | Hwy 45 | 2031 | Resurface Hwy 45 from Hwy 210 in Carlton to I-35 | $2,824,000 | 0910-34 |
76 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of CR 86 to Hwy 2 | $4,800,000 | NA |
75 | Hwy 1 | 2023 | Resurface Highway 1 from 0.5 miles North of Bass Lake Rd to Highway 65. | $5,868,420 | 3101-38/3101-39 |
75 | Hwy 23 | Not Selected | Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave | $3,400,000 | Cost is greater than available budget; also scored as urban project |
74 | Hwy 169 | 2027-2028 | Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd) | $4,000,000 | 3809-09 |
73 | Hwy 11 | 2032 | Resurface Hwy 11 from just east of CR 23 to end of Hwy 11 | $5,042,000 | 3606-68 |
73 | Hwy 73 | Not Selected | Resurface Hwy 73 from 13th St NW to NFD 111 | $5,600,000 | NA |
73 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129 | $5,700,000 | NA |
70 | Hwy 1 | 2032 | Resurface Hwy 1 from Salveson Rd to Hwy 61 | $3,734,000 | 3803-35 |
69 | Hwy 48 | Not Selected | Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line | $7,300,000 | NA |
68 | Hwy 65 | 2024 | Highway 65 from North Jct Highway 27 to East Jct Highway 210. Resurface Roadway | $2,800,000 | 0111-27 |
67 | Hwy 1 | Not Selected | Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County road 38 | $300,000 | NA |
67 | Hwy 73 | 2029 | Resurface Hwy 73 from 1st Ave to just north of CR 191 in Floodwood | $2,351,000 | 6928-1038389 |
66 | Hwy 1 | Not Selected | Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River | $300,000 | NA |
66 | Hwy 73 | Not Selected | Resurface Hwy 73 from I-35 to just north of the Moose Horn River | $7,000,000 | NA |
65 | Hwy 1 | Not Selected | Resurface Hwy 1 from just west of St Louis County Road 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd | $7,500,000 | NA |
64 | Hwy 38 | 2028 | Resurface Hwy 38 from just north of CR 49 to just north of CR 19 and from 0.9 miles south of CR 262 to Newburg Bay Rd | $4,213,000 | 3108-86 |
63 | Hwy 38 | Not Selected | Resurface Hwy 38 from just north of Itasca County Road 19 to south limits of Bigfork | $12,700,000 | NA |
62 | Hwy 1 | Not Selected | Resurface Hwy 1 from New Tomahawk Rd to Isabella/NFD-172 | $1,800,000 | NA |
62 | Hwy 70 | 2031 | Resurface Hwy 70 from CR 61 to just east of CR 61 | $500,000 | 5811-14 |
60 | Hwy 65 | 2031 | Resurface Hwy 65 from Hwy 169 to just north of Hawkins Ave in Nashwauk | $775,000 | 3112-38 |
56 | Hwy 1 | Not Selected | Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River | $7,800,000 | NA |
47 | Hwy 1 | Not Selected | Resurface Hwy 1 from just north of the Kawishiwi River to just west of T-273 | $3,400,000 | NA |
45 | Hwy 73 | Not Selected | Resurface Hwy 73 from just north of the Moose Horn River to Hwy 27 | $200,000 | NA |
40 | Hwy 27 | Not Selected | Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61 | $400,000 | NA |
27 | Hwy 123 | Not Selected | Resurface Hwy 123 from Pine County Road 30 to Hwy 23 | $1,400,000 | NA |
18 | Hwy 37 | Not Selected | Repair Hwy 37 concrete pavement from Hwy 169 to just east of Iron Jct Rd | $100,000 | NA |
18 | Hwy 38 | Not Selected | Resurface Hwy 38 from Hwy 2 to 17th St NW | $400,000 | NA |
Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
92 | Hwy 23 | Resurface Hwy 23 in Duluth from 5th ST W. to Hwy 39. | $2,100,000 | 2023 | 6910-105 |
86 | Hwy 194 | Resurface Hwy 194 from Hwy 2 to Hwy 53 | $3,900,000 | Not Selected | Cost is greater than available budget |
85 | Hwy 23 | Resurface Hwy 23 from McCuen St to Becks Rd/St. Louis County Road 3 | $3,300,000 | 2031 | Scored as urban, but scores higher as Non-NHS project. 6910-113 |
85 | Hwy 48 | Resurface Hwy 48 from just east of I-35 to Pine County Road 21 | $4,800,000 | Not Selected | Preventive maintenance planned for 2022 to improve/extend life until later programming |
83 | Hwy 1 | Hwy 1 West Jct Hwy 169 to jct Hwy 135 in Tower., and Hwy 169 from Pike River to Hwy 1. Resurface Roadway. | $3,400,000 | 2023 | 6903-17 |
81 | Hwy 73 | Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm | $4,400,000 | 2026 | Scored as urban project; listed as one project in CHIP; 6930-42 |
81 | Hwy 23 | Resurface Hwy 23 from Boyd St to I-35 | $2,300,000 | Not Selected | Cost is greater than available budget |
79 | Hwy 73 | Resurface Hwy 73 from West Swan River bridge to Hwy 169 | $7,000,000 | Not Selected | Cost is greater than available budget |
79 | Hwy 23 | Resurface Highway 23 from just east of Pine/Carlton County line to St Louis River bridge | $8,300,000 | 2030 | 0901-81 |
79 | Hwy 210 | Resurface Hwy 210 from the end of the 4-lane to just south of Vermillion St | $3,300,000 | 2030 | Scored as urban, but scores higher as Non-NHS project; 0916-1038046 |
78 | Hwy 169 | Resurface Hwy 1 West Jct Hwy 169 to jct Hwy 135 in Tower., and Hwy 169 from Pike River to Hwy 1. | $3,400,000 | 2023 | Combined with other project, now under 6903-17 |
77 | Hwy 73 | Resurface Hwy 73 from Johnson Rd to Hwy 1 and replace bridges over the Sturgeon River and Little Fork River | $17,070,000 | 2026 | 6930-41; includes two bridge replacements |
76 | Hwy 73 | Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm | $4,400,000 | 2026 | Scored as urban project; listed as one project in CHIP; 6930-42 |
76 | Hwy 73 | Resurface Hwy 73 from just north of CR 86 to Hwy 2 | $4,800,000 | Not Selected | Preventive maintenance planned for 2022 to improve/extend life until later programming |
76 | Hwy 23 | Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line | $10,900,000 | Not Selected | Cost is greater than available budget |
76 | Hwy 23 | Resurface Hwy 23 from Sandstone to Askov and intersection lighting at Jct of Hwy 18 and Pine County Road 61 | $4,200,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP); 5809-16 |
76 | Hwy 135 | Resurface Hwy 135 from just north of the Embarrass River to Hwy 1 | $5,200,000 | 2028 | 6913-1039090 |
76 | Hwy 45 | Resurface Hwy 45 from Hwy 210 to I-35 | $1,700,000 | 2031 | 0910-34 |
76 | Hwy 1 | Resurface Hwy 1 from Hwy 53 to Hwy 169 | $6,900,000 | 2028 | 6902-1038565 |
75 | Hwy 1 | Resurface Highway 1 from 0.5 miles North of Bass Lake Rd to Highway 65. | $6,300,000 | 2023 | Exempt (in 2019-2022 STIP); 3101-38 |
75 | Hwy 65 | Resurface highway from N. jct Highway 1 to .5 mi. s. Koochiching County Highway 8 |
$11,100,000 | 2022 | Exempt (in 2019-2022 STIP); 3609-42 |
75 | Hwy 23 | Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave | $3,400,000 | Not Selected | Cost is greater than available budget; also scored as urban project |
74 | Hwy 39 | Resurface Hwy 39 from Hwy 23 to Hwy /WI state line | $700,000 | Not Selected | NA |
74 | Hwy 169 | Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd) | $3,800,000 | 2027 | 3809-09 |
73 | Hwy 73 | Resurface Hwy 73 from 13th St NW to NFD 111 | $5,600,000 | Not Selected | NA |
73 | Hwy 73 | Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129 | $5,700,000 | Not Selected | NA |
69 | Hwy 18 | Resurface Hwy 18 in Finlayson to Hwy 23 | $4,100,000 | 2031 | Scored as urban project; 5808-1038045 |
69 | Hwy 48 | Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line | $7,300,000 | Not Selected | NA |
68 | Hwy 65 | Resurface Hwy 65 from North Jct Hwy 27 to East Jct Hwy 210. |
$2,700,000 | 2024 | 0111-27 |
67 | Hwy 1 | Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County road 38 | $300,000 | Not Selected | NA |
67 | Hwy 73 | Resurface Hwy 73 from 1st Ave to just north of St. Louis County Road 191 in Floodwood | $2,400,000 | 2029 | 6928-1038389 |
66 | Hwy 1 | Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River | $300,000 | Not Selected | NA |
66 | Hwy 73 | Resurface Hwy 73 from I-35 to just north of the Moose Horn River | $7,000,000 | Not Selected | NA |
66 | Hwy 38 | Hwy 38 South Limits Big Fork to 0.3 miles South Itasca County Road 14, Resurface roadway, sidewalks, improve pedestrian access | $2,500,000 | 2023 | Scored as urban project; 3108-83 |
65 | Hwy 1 | Resurface Hwy 1 from just west of St Louis County Road 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd | $7,500,000 | Not Selected | NA |
64 | Hwy 38 | Resurface Hwy 38 from just north of CR 49 to just north of CR 19 and from 0.9 miles south of CR 262 to Newburg Bay Rd | $4,400,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) 3108-86 |
63 | Hwy 38 | Resurface Hwy 38 from just north of Itasca County Road 19 to south limits of Bigfork | $12,700,000 | Not Selected | NA |
62 | Hwy 1 | Resurface Hwy 1 from New Tomahawk Rd to Isabella/NFD-172 | $1,800,000 | Not Selected | NA |
62 | Hwy 1 | Resurface Hwy 1 from Salveson Rd to Hwy 61 | $16,700,000 | Not Selected | NA |
62 | Hwy 70 | Resurface Hwy 70 from Pine County Road 61 to just east of Pine County Road 61 | $500,000 | 2031 | 5811-14; Other needs in the area under consideration (District 1 Freight Plan) |
61 | Hwy 65 | Resurface Hwy 65 from Hwy 169 NB to Hawkins Ave in Nashwauk | $500,000 | Not Selected | NA |
57 | Hwy 11 | Resurface Hwy 11 from just east of West Island View Rd to the end of Hwy 11 | $1,300,000 | Not Selected | NA |
56 | Hwy 1 | Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River | $7,800,000 | Not Selected | NA |
55 | Hwy 73 | Resurface Hwy 73 from Hwy 27 to 3rd Ave | $3,000,000 | 2029 | Scored as urban project; 0912-1038575 |
47 | Hwy 1 | Resurface Hwy 1 from just north of the Kawishiwi River to just west of T-273 | $3,400,000 | Not Selected | NA |
45 | Hwy 73 | Resurface Hwy 73 from just north of the Moose Horn River to Hwy 27 | $200,000 | Not Selected | NA |
40 | Hwy 73 | Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm | $4,400,000 | 2026 | Scored as urban project; listed as one project in CHIP; 6930-42 |
40 | Hwy 27 | Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61 | $400,000 | Not Selected | NA |
29 | Hwy 217 | Resurface Hwy 217 in Littlefork | $3,200,000 | 2030 | Scored as urban project; 3614-24 |
27 | Hwy 123 | Resurface Hwy 123 from Pine County Road 30 to Hwy 23 | $1,400,000 | Not Selected | NA |
18 | Hwy 37 | Repair Hwy 37 concrete pavement from Hwy 169 to just east of Iron Jct Rd | $100,000 | Not Selected | NA |
18 | Hwy 38 | Resurface Hwy 38 from Hwy 2 to 17th St NW | $400,000 | Not Selected | NA |
15 | Hwy 210 | Resurface Hwy 210 from just south of Vermillion St to Hwy 23 | $2,700,000 | Not Selected | NA |
Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
88 | Hwy 37 | Resurface highway from State Highway 53 to State Highway 135 through Gilbert. |
$6,500,000 | 2021 | NA |
86 | Hwy 45 | Resurface Hwy 45 from Hwy 210 to I-35 | $800,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
85 | Hwy 23 | Resurface Hwy 23 from McCuen St to Becks Rd/Pipestone County Road 3 | $3,000,000 | 2029 | Scored as urban, but scores higher as Non-NHS project |
85 | Hwy 135 | Resurface Hwy 135 from Hwy 53 to just north of the Embarrass River | $4,800,000 | Not Selected | On the ground conditions do not match RQI prediction. |
83 | Hwy 1 | Hwy 1 West Jct Hwy 169 to jct Hwy 135 in Tower. Resurface Roadway. |
$2,300,000 | 2023 | NA |
81 | Hwy 27 | Resurface highway from State Highway 65 to Aitkin/Carlton County Line |
$5,000,000 | 2022 | NA |
81 | Hwy 194 | Resurface Hwy 194 from Hwy 2 to Hwy 53 | $2,000,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
78 | Hwy 73 | Resurface Hwy 73 from West Swan River bridge to Hwy 169 | $3,500,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
78 | Hwy 169 | Resurface Hwy 169 from Pike River to Hwy 1 |
$1,600,000 | 2024 | NA |
78 | Hwy 23 | Resurface Highway 23 from just east of Pine/Carlton County line to St Louis River bridge | $8,400,000 | 2030 | NA |
78 | Hwy 210 | Resurface Hwy 210 from the end of the 4-lane to just south of Vermillion St | $2,900,000 | 2028 | Scored as urban, but scores higher as Non-NHS project |
77 | Hwy 73 | Resurface Hwy 73 from National Forest Road 111 to Hwy 1 | $15,400,000 | 2026 | NA |
76 | Hwy 1 | Resurface Hwy 1 from Hwy 53 to Hwy 169 | $6,900,000 | 2028 | NA |
75 | Hwy 1 | Resurface the highway from the east junction of Highway 65 to the north junction of Highway 53 in Itasca County and on Hwy 73 from the junction of Highway 1 to the junction of Highway 53 and Rehab bridge#69106 in St. Louis County | $7,800,000 | 2021 | Selected prior to policy (in 2019-2022 STIP), listed as one project in STIP |
75 | Hwy 1 | Resurface highway from N. Bass Lake Rd to .7 mi. S County Rd 550 and State Highway 1 from 0.1 MI South.Township Rd-551 Thistledew Lake Campground Rd to East. JCT State Highway 65 resurface the roadway. | $7,500,000 | 2023 | Listed as two projects in the STIP |
75 | Hwy 65 | Resurface highway from N. jct Highway 1 to .5 mi. s. Koochiching County Highway 8 |
$11,700,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
74 | Hwy 169 | Resurface Hwy 169 from Hidden Valley Rd to Lake County Road 18 (Power Dam Rd) | $3,400,000 | 2026 | NA |
74 | Hwy 18 | Resurface Hwy 18 from west limits of Finlayson to Hwy 23 | $1,100,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
73 | Hwy 65 | Hwy 65 from North Jct Hwy 27 to East Jct Hwy 210. Resurface Roadway |
$3,600,000 | 2024 | NA |
73 | Hwy 73 | Resurface Hwy 73 from Hwy 2 to West Swan River bridge | $3,700,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
73 | Hwy 73 | Resurface Hwy 73 from just north of 3rd Ave to north of Carlton County Road 129 | $2,900,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
73 | Hwy 37 | Resurface Hwy 37 from Hwy 169 to just east of Iron Jct Rd | $700,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
72 | Hwy 65 | Resurface Hwy 65 from Hwy 169 NB to Hawkins Ave in Nashwauk | $300,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
72 | Hwy 73 | Resurface Hwy 73 from 13th St NW to National Forest Road 111 | $2,800,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
92 | Hwy 23 | Hwy 23 in Duluth from 5TH ST W. to Hwy 39. Resurface Roadway | $1,000,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
72 | Hwy 70 | Resurface Hwy 70 from Hwy 361 to just east of Hwy 361 | $200,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
71 | Hwy 1 | Resurface Hwy 1 from Hwy 169 to just north of the Kawishiwi River | $3,900,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
71 | Hwy 73 | Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm | $2,200,000 | 2026 | Scored as urban |
71 | Hwy 73 | Resurface Hwy 73 from just north of Saint Louis County Road 86 to Hwy 2 | $2,400,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
70 | Hwy 1 | Resurface Hwy 1 from Salveson Rd to Hwy 61 | $2,600,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
70 | Hwy 1 | Resurface Hwy 1 from New Tomahawk Rd to Isabella/National Forest Road-172 | $4,800,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
70 | Hwy 65 | Resurface highway from Koochiching County Highway 8 to State Highway 71 |
$4,200,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
69 | Hwy 48 | Resurface Hwy 48 from Pine County Road 21 to Hwy /WI state line | $3,700,000 | Not Selected | NA |
67 | Hwy 1 | Resurface Hwy 1 from just north of the Kawishiwi River to just south of the Kawishiwi River | $300,000 | 2029 | NA |
67 | Hwy 11 | Resurface Hwy 11 from just east of West Island View Rd to the end of Hwy 11 | $1,200,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
66 | Hwy 73 | Resurface Hwy 73 from I-35 to just north of the Moose Horn River | $3,600,000 | Not Selected | NA |
66 | Hwy 169 | Resurface Hwy 169 from just south of Saint Louis County Road 26 to just southwest of Hwy 1 | $400,000 | Not Selected | NA |
66 | Hwy 6 | Resurface Hwy 6 from just south of RP 133 to Hwy 71 | $5,400,000 | Not Selected | NA |
65 | Hwy 1 | Resurface Hwy 1 from just west of CR 21 to Hwy 169 and Highway 169 from Hwy 1 to Hidden Valley Rd | $6,600,000 | Not Selected | NA |
65 | Hwy 73 | Resurface the highway from the east junction of Highway 65 to the north junction of Highway 53 in Itasca County and on Hwy 73 from the junction of Highway 1 to the junction of Highway 53 and Rehab bridge#69106 in St. Louis County | $1,000,000 | 2021 | Selected Prior to policy (in 2019-2022 STIP), listed as one project in STIP |
65 | Hwy 123 | Resurface highway drainage improvements & pedestrian access improvements in Sandstone. |
$3,400,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
65 | Hwy 38 | Resurface Hwy 38 from just south of CR 14 to Hwy 1/Itasca County Road 5 | $1,700,000 | Not Selected | NA |
64 | Hwy 65 | Resurface Hwy 65 from 1.4 miles south of Sandy River to Hwy 200 | $4,500,000 | Not Selected | NA |
64 | Hwy 38 | Resurface Hwy 38 from 0.9 miles south of Itasca County Road 262 to Newburg Bay Rd | $1,000,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
64 | Hwy 135 | Resurface Hwy 135 from just north of the Embarrass River to Hwy 1 | $4,800,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
63 | Hwy 73 | Resurface Hwy 73 from 1st Ave to just north of Saint Louis County Road 191 in Floodwood | $2,300,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
63 | Hwy 73 | Resurface Hwy 73 from north of Carlton County Road 129 to Hwy 210 | $2,000,000 | Not Selected | NA |
62 | Hwy 23 | Resurface Hwy 23 from Sandstone to Askov and intersection lighting at Jct of Hwy 18 and Pine County Road 61 | $3,800,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
61 | Hwy 1 | Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County Road 38 | $200,000 | Not Selected | NA |
59 | Hwy 38 | Resurface Hwy 38 from just north of Itasca County Road 49 to just north of Itasca County Road 19 | $2,800,000 | 2025 | Smaller repair selected while longer term funding is secured for reconstruction |
57 | Hwy 1 | Resurface Hwy 1 from just north of the Kawishiwi River to just west of Stony River Township Road-273 | $1,700,000 | Not Selected | NA |
56 | Hwy 38 | Hwy 38 South Limits Bigfork to 0.3 miles South Itasca County Road 14 Resurface roadway sidewalks improve pedestrian access |
$2,600,000 | 2023 | Scored as urban project |
50 | Hwy 73 | Resurface Hwy 73 from just north of the Moose Horn River to Hwy 27 | $100,000 | Not Selected | NA |
45 | Hwy 27 | Resurface Hwy 27 from Kenwood Ave to Carlton County Road 61 | $200,000 | Not Selected | NA |
42 | Hwy 73 | Resurface Hwy 73 from where Hwy 73 turns left to 13th St NW | $1,800,000 | 2026 | Scored as urban |
40 | Hwy 73 | Concrete pavement repair on Hwy 73 from 4th St in Chisholm to where Hwy 73 turns left | $600,000 | 2026 | Scored as urban |
40 | Hwy 38 | Resurface Hwy 38 from Hwy 2 to 17th St NW | $200,000 | Not Selected | NA |
33 | Hwy 39 | Resurface Hwy 39 from Hwy 23 to Hwy /WI state line | $400,000 | Not Selected | NA |
30 | Hwy 73 | Resurface Hwy 73 from Hwy 27 to 3rd Ave | $2,800,000 | 2028 | Scored as urban |
29 | Hwy 65 | Resurface Hwy 65 from just south of Aitkin County Road 2 to Hwy 27 | $2,100,000 | Not Selected | NA |
29 | Hwy 217 | Resurface Hwy 217 in Littlefork | $2,600,000 | 2025 | Scored as urban project |
27 | Hwy 123 | Resurface Hwy 123 from Pine County Road 30 to Hwy 23 | $700,000 | Not Selected | NA |
25 | Hwy 48 | Resurface Hwy 48 from just east of I-35 to Pine County Road 21 | $200,000 | Not Selected | NA |
24 | Hwy 65 | Resurface Hwy 65 from Hwy 210 to 1.4 miles south of Sandy River | $200,000 | Not Selected | NA |
23 | Hwy 11 | Resurface Hwy 11 from just east of Koochiching County Road 332 to just east of Koochiching County Road 23 | $200,000 | Not Selected | NA |
22 | Hwy 23 | Resurface Hwy 23 from Boyd St to I-35 | $200,000 | Not Selected | NA |
18 | Hwy 38 | Resurface Hwy 38 from 1.1 miles north of Hwy 2 to just north of Itasca County Road 49 | $200,000 | Not Selected | NA |
17 | Hwy 65 | Resurface Hwy 65 from Hawkins Ave in Nashwauk to Hwy 1 | $200,000 | Not Selected | NA |
17 | Hwy 11 | Resurface Hwy 11 from Hwy 53 to just east of Koochiching County Road 332 | $200,000 | Not Selected | NA |
17 | Hwy 11 | Resurface Hwy 11 from just east of Koochiching County Road 23 to .8 miles west of Island View Circle | $200,000 | Not Selected | NA |
17 | Hwy 18 | Resurface Hwy 18 from Hwy 47 to west limits of Finlayson | $200,000 | Not Selected | NA |
17 | Hwy 70 | Resurface Hwy 70 from Hwy 107 to Hwy 361 | $200,000 | Not Selected | NA |
15 | Hwy 210 | Resurface Hwy 210 from just south of Vermillion St to Hwy 23 | $1,400,000 | Not Selected | NA |
14 | Hwy 73 | Resurface Hwy 73 from Hwy 210 to Carlton/St Louis County Line | $200,000 | Not Selected | NA |
12 | Hwy 200 | Resurface Hwy 200 from Hwy 65 to Hwy 2 | $200,000 | Not Selected | NA |
11 | Hwy 23 | Resurface Hwy 23 from Main St in Askov to just east of the Pine/Carlton County line | $200,000 | Not Selected | NA |
10 | Hwy 217 | Resurface Hwy 217 from Front St to Hwy 53 | $200,000 | Not Selected | NA |
9 | Hwy 200 | Resurface Hwy 200 from Hwy 169 in Hill City to Hwy 65 | $200,000 | Not Selected | Chip seal being scheduled |
4 | Hwy 6 | Resurface Hwy 6 from Hwy 1 to just north of Hwy 1 | $200,000 | Not Selected | NA |
1 | Hwy 289 | Resurface Hwy 289 from Hwy 73 to end of Hwy 289 | $200,000 | Not Selected | NA |
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
92 | Hwy 23 | Reclaim and overlay from St Louis Bridge to Highway 39 | $2,200,000 | 2023 | NA |
91 | US2 | Major concrete rehabilitation from reference point 260 to I-35 | $800,000 | Not Selected | District anticipates the pavement condition will not deteriorate as fast as the model is projecting |
90 | Hwy 73 | Full mill and replace from Moose Horn River to Highway 27 | $400,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
89 | Hwy 37 | Medium mill and overlay from Highway 53 to 135 | $2,800,000 | 2020 | NA |
87 | US2 /Hwy 6 | Medium mill and overlay in multiple locations in Itasca county | $1,700,000 | 2020 | NA |
83 | Hwy 1 | Medium mill and overlay from Highway 169 to Cedar St | $2,800,000 | 2023 | NA |
83 | Hwy 1/US169 | Medium mill and overlay in multiple locations in St. Louis County | $1,100,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
82 | Hwy 48 | Medium mill and overlay from east of I-35 to Pine County Highway 21 | $6,000,000 | 2029 | NA |
81 | Hwy 27 | Medium mill and overlay from Highway 65 to Kenwood ave | $5,400,000 | 2022 | NA |
81 | Hwy 73 | Full mill and replace from I-35 to Moose Horn Rver | $1,300,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
80 | Hwy 169 | Medium mill and overlay from Highway 53 to Reference Point 381 | $4,700,000 | 2020 | NA |
79 | Hwy 135 | Reconstruction from railroad crossing to St. Louis County Road 4 | $10,000,000 | 2020 | NA |
79 | Hwy 11 | Medium mill and overlay from Highway 53 to Highway 332 | $400,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
78 | Hwy 23 | Medium mill and overlay from Pine/Carlton County Line to St Louis River Br | $10,500,000 | 2023 | NA |
78 | Hwy 169 | Medium mill and overlay from Pike River to junction with Highway 1 | $2,000,000 | 2024 | NA |
78 | Hwy 46 | Reclaim and overlay from Itasca County Highway 13 to Koochiching County Highway 40 | $7,800,000 | 2025 | NA |
78 | Hwy 46 | Reclaim and overlay from Itasca County Highway 39 to Itasca County Highway 13 | $28,000,000 | 2028 | NA |
78 | Hwy 38 | Medium mill and overlay from 17th St to Itasca County Highway 49 | $3,700,000 | 2029 | NA |
78 | Hwy 11 | Medium mill and overlay from Highway 332 to Koochiching County Road 20 | $1,500,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
78 | Hwy 65 | Medium mill and overlay from Hawkins ave to Highway 1 | $16,000,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
78 | Hwy 169 | Medium mill and overlay from reference post 381 to 1100 feet south of Highway 1 | $900,000 | Not Selected | NA |
77 | Hwy 73 | Reclaim and overlay from National Forest Route 111 to Highway 1 | $22,000,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
77 | Hwy 23 | Medium mill and overlay from Highway 39 to Becks Rd | $700,000 | Not Selected | NA |
77 | Hwy 73 | Reclaim and overlay at Highway 169/Dillon Rd | $7,400,000 | Not Selected | NA |
77 | Hwy 48 | Reconstruction from I-35 overpass to Morris Ave | $2,400,000 | Not Selected | NA |
77 | Hwy 70 | Medium mill and overlay from Highway 107 to Highway 361 | $4,800,000 | Not Selected | NA |
76 | Hwy 1 | Medium mill and overlay from Highway 65 to Highway 53 | $7,400,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
76 | Hwy 1 | Medium mill and overlay from Highway 53 to Highway 169 | $9,800,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
75 | Hwy 65 | Reclaim and overlay from Highway 1 to Koochiching County Highway 9 | $24,000,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
75 | Hwy 1 | Reclaim and overlay from Reference point 198 to Reference point 207 | $4,600,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
75 | Hwy 1 | Reclaim and overlay from Reference point 207 to Highway 65 | $4,700,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
75 | Hwy 45 | Medium mill and overlay from Highway 210 to I-35 | $1,800,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
75 | Hwy 1 | Medium mill and overlay from 5th St to Highway 6 | $16,000,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
74 | Hwy 169 | Thick mill and overlay from Hidden Valley Rd to Lake County Highway 18/Power Dam Rd | $2,500,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
74 | Hwy 18 | Medium mill and overlay from Finlayson to Pine County Highway 61 | $1,600,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP), also listed as an Urban Pavement Project |
74 | Hwy 70 | Medium mill and overlay from Highway 361 to 0.3 miles east of Highway 361 | $200,000 | Not Selected | NA |
73 | Hwy 1 | Medium Mill and overlay from Highway 169 to Kawishiwi River | $5,300,000 | Not Selected | NA |
73 | Hwy 37 | Medium mill and overlay from Highway 169 to Iron Jct Rd | $1,100,000 | Not Selected | NA |
73 | Hwy 73 | Reclaim and overlay from 3rd Ave to Carlton County Road 129 | $5,900,000 | Not Selected | NA |
73 | Hwy 217 | Medium mill and overlay from Front St to Highway 53 | $8,600,000 | Not Selected | NA |
72 | Hwy 47 | Medium mill and overlay from Aitkin County Road 80 to South of 305th Ave | $3,200,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
72 | Hwy 6 | Medium mill and overlay from Highway 286 to Highway 1 | $7,000,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
72 | Hwy 73 | Reclaim and overlay from 13th St NW to south of Frider Rd near Chisholm | $5,600,000 | Not Selected | NA |
70 | Hwy 65 | Medium mill and overlay from Highway 200 to Highway 169 | $6,800,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
70 | Hwy 65 | Medium mill and overlay from Koochiching County Highway 8 to Highway 71 | $6,000,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
70 | Hwy 1 | Full mill and replace from Salveson Road to Highway 61 | $4,600,000 | Not Selected | NA |
70 | US2 | Reclaim and overlay from Floodwood to St. Louis County Road 845 | $9,100,000 | Not Selected | NA |
69 | Hwy 200 | Medium mill and overlay from Highway 169 to Highway 65 | $9,200,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
69 | Hwy 1 | Medium mill and overlay from Beltrami/Koochiching County line to Highway 71 | $2,500,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
69 | Hwy 210 | Medium mill and overlay from I-35 to Vermillion St | $4,800,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP), Also listed as urban pavement project |
69 | Hwy 11 | Medium mill and overlay from US/Canada Border to Koochiching County Road 83 | $8,900,000 | Not Selected | NA |
69 | Hwy 48 | Medium mill and overlay from Pine County Highway 21 to Minnesota/Wisconsin State Line | $7,300,000 | Not Selected | NA |
68 | Hwy 11 | Medium mill and overlay from Reference post 167 to Koochiching County Rd 82 | $4,400,000 | Not Selected | NA |
68 | Hwy 11 | Medium mill and overlay from Bigfork River Bridge to Highway 71 | $3,000,000 | Not Selected | NA |
67 | Hwy 11 | Medium mill and overlay from Island View City limits to Dove Island | $1,600,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
67 | Hwy 1 | Medium mill and overlay from 0.2 miles north of Kawishiwi River to 0.2 miles south of Kawishiwi River | $400,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
66 | Hwy 123 | Reclaim and overlay from Highway 23 to Pine County Highway 30 | $2,300,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
66 | Hwy 217 | Reconstruction from Highway 65 to Front St | $1,200,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP), also listed as an Urban Pavement Project |
66 | Hwy 11 | Medium mill and overlay from Koochiching County Road 82 to Bigfork River bridge | $2,400,000 | Not Selected | NA |
66 | Hwy 210 | Medium mill and overlay from Vermillion St to Highway 23 | $4,000,000 | Not Selected | NA |
65 | Hwy 73 | Medium mill and overlay from Highway 1 to Highway 53 | $1,900,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
65 | Hwy 1 | Reclaim and overlay from Highway 71 to Highway 46 | $300,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 1 | Reclaim and overlay from Itasca County Highway 38 to 0.5 miles north of Bass Lake Rd | $7,200,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 11 | Medium mill and overlay from just west of McCloud Creek to 1 mile west of Koochiching County Road 4 | $900,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 11 | Medium mill and overlay from Koochiching County Road 83 to 1 mile east of Koochiching County Road 83 | $700,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 27 | Reconstruction from Kenwood Ave to Carlton County Highway 61 | $6,300,000 | Not Selected | NA |
64 | Hwy 38 | Medium mill and overlay from 0.9 miles south of Itasca County Road 262 to Newburg Bay Rd | $1,400,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
64 | Hwy 135 | Medium mill and overlay from just north of Embarrass River to Highway 1 | $8,300,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
64 | Hwy 73 | Medium mill and overlay from Highway 210 reference post 25 | $3,100,000 | Not Selected | NA |
63 | Hwy 73 | Medium mill and overlay from Floodwood to Saint Louis County Road 191 | $3,200,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
63 | Hwy 47 | Medium mill and overlay from 305th Ln to Highway 169 | $9,100,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
63 | Hwy 1 | Medium mill and overlay from Tomahawk Rd to Lake County Highway 2 | $2,600,000 | Not Selected | NA |
62 | Hwy 65 | Medium mill and overlay from north of Aitkin County Road 27 to Highway 210 | $4,500,000 | 2023 | Selected prior to policy (in 2019-2028 CHIP) |
62 | Hwy 23 | Medium overlay from Highway 18 to Main St in Askov | $4,900,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
62 | Hwy 18 | Medium mill and overlay from Highway 169 to Highway 47 | $7,400,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
62 | Hwy 6 | Medium mill and overlay at Highway 1 to .24 miles north Highway 1 | $1,400,000 | Not Selected | NA |
61 | Hwy 73 | Medium mill and overlay from Saint Louis County Road 86 to Highway 2 | $6,100,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
61 | Hwy 47 | Medium mill and overlay from Mille Lacs/Aitkin County line to Aitkin County Road 80 | $4,700,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
60 | Hwy 1 | Thick mill and overlay from Highway 38 to Itasca County Highway 38 | $300,000 | Not Selected | NA |
59 | Hwy 38 | Medium mill and overlay from Itasca County Highway 49 to Itasca County Highway 19 | $3,800,000 | 2025 | Smaller repair selected while longer term funding is secured for reconstruction |
58 | Hwy 6 | Medium mill and overlay from Bigfork River Bridge to Highway 1 | $4,800,000 | 2028 | Smaller repair selected while longer term funding is secured for reconstruction |
57 | Hwy 6 | Reclaim and overlay from Cass/Itasca County line to Highway 2 | $5,700,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
57 | Hwy 107 | Medium mill and overlay from Kanabec/Pine Co line to Highway 23 | $6,700,000 | 2027 | Smaller repair selected while longer term funding is secured for reconstruction |
57 | Hwy 1 | Reclaim and overlay from Kawishiwi River to National Forest Road 553 | $3,400,000 | Not Selected | NA |
55 | Hwy 38 | Medium mill and overlay from Itasca County Highway 14 to Highway 1 | $4,300,000 | 2027 | Smaller repair selected while longer term funding is secured for reconstruction |
54 | Hwy 38 | Full mill and replace from Big Fork to Highway 38 | $600,000 | 2023 | Selected prior to policy (in 2019-2022 STIP), also listed as Urban Pavement project |
51 | Hwy 289 | Full mill and replace from Highway 73 to Highway 289 | $400,000 | Not Selected | NA |
44 | Hwy 194 | Medium mill and overlay from Highway 2 to Highway 53 | $3,000,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
42 | Hwy 65 | Medium mill and overlay from Highway 210 to Sandy River | $6,100,000 | Not Selected | NA |
37 | Hwy 200 | Thin mill and overlay from Highway 65 to Highway 2 | $3,200,000 | Not Selected | NA |
36 | Hwy 6 | Medium mill and overlay from reference post 93 to Itasca County Road 136 | $5,000,000 | 2028 | District 2 construction district funded project |
36 | Hwy 200 | Medium mill and overlay from Cass/Aitkin County line to Highway 169 | $4,100,000 | Not Selected | NA |
32 | Hwy 6 | Medium mill and overlay from Itasca County Road 136 to Highway 286 | $2,900,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
29 | Hwy 11 | Medium mill and overlay from Koochiching County line to reference post 146 | $7,100,000 | Not Selected | NA |
27 | Hwy 123 | Thin mill and overlay from Pine County Highway 30 to Highway 23 | $1,400,000 | Not Selected | NA |
25 | Hwy 11 | Medium mill and overlay from reference Town Road 129 to US/Canada Border | $1,000,000 | 2029 | Ongong maintenance concerns |
25 | Hwy 73 | Medium mill and overlay from Highway 27 to 3rd Ave | $1,900,000 | 2029 | District anticipates the pavement condition will deteriorate faster than the model is projecting. Also listed as an urban pavement project |