Project selection

Increasing the transparency of how we select highway construction projects

Urban non-freeway/non-expressway pavement projects

MnDOT District 1

Scoring criteria for urban non-freeway, non-expressway pavement projects. Out of 100 possible points, 25 points are based on the timing of the improvement, 25 points are based on cracking, rutting and patching, 10 points are based on traffic volume, 10 points are based on compliance with the Americans with Disability Act, 10 points are based on active transportation and transit, 10 points are based on other infrastructure needs, 5 points are based on the condition of local utilities under the road, and 5 points are based on whether the project will benefit an environmental justice population.

Learn more about how MnDOT evaluates and selects urban pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. MnDOT scores and prioritizes urban non-freeway/non-expressway pavement projects separately from the normal pavement scoring process, because of their complexity, utilities and other infrastructure and level of required local coordination and public involvement. In many instances, these roads function both as state highways and as city streets. These pavement projects can be on either National Highway System or non-NHS.

Freeways have full access control (no driveways, signals or at-grade intersections). Expressways have partial access control (limited or no driveways, few and widely spaced intersections, and may include some grade separated crossings). Both are high speed roads designed to facilitate longer trips.

For the purposes of this scoring category, MnDOT uses a flexible, context-based definition of urban. This includes areas with medium-to-high density adjacent development with small to medium setbacks, and in some instances no setback. This includes both residential, industrial and commercial areas. In some instances, the urban context may cover less than a quarter mile.

Urban pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related Links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2024

Score Route  Community Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
92 Hwy 61 Duluth/London Road Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E.,  Pavement Resurface, Trail $8,300,000 2025 Scored as NHS Pavement  6925-145
91 Hwy 11 International Falls Resurface Hwy 11 from just west of Koochiching County Road 332 to 6th Ave W in International Falls $5,200,000 2028 3605-43 
90 Hwy 33 Cloquet Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet $2,000,000 2029 0905-56
90 US2 Grand Rapids Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169 $3,800,000 2028 3103-1037794
85 Hwy 61 Two Harbors Reconstruct Hwy 61 from just north of the DM&IR railway bridge to just east of 5th St  $6,400,000 2025 3804-62
84 Hwy 23 Duluth Resurface Hwy 23 from McCuen St to Becks Rd/St. Louis County Road 3 $3,300,000 2031 6910-113
81 Hwy 38 Bigfork Hwy 38 South Limits Bigfork to 0.3 miles South Itasca County Road 14 Resurface roadway sidewalks improve pedestrian access  $2,500,000 2023 3108-83
80 Hwy 23 Duluth Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave $3,400,000 NA Cost is greater than available budget; also scored as Non-NHS pavement project
80 Hwy 194 Duluth/Central Entrance Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth $14,300,000 2026 6933-99
79 US2 Proctor Resurface Hwy 2 from Hwy 194 to just east of Boundary Ave in Proctor $10,800,000 2026 6908-68
79 US2 Warba Reconstruct Hwy 2 from just west of CR 73 to just west of CR 74 in Warba $4,000,000 2027 3104-63
76 US2 La Prairie/Grand Rapids Resurface EB and WB Hwy 2 in Grand Rapids to just east of La Prairie Ave

$3,300,000 2024 3104-61
73 US53 Cook Resurface Hwy 53 from just south of Cook to south limits of Cook $800,000 NA NA
73 Hwy 210 Carlton Resurface Hwy 210 from the end of the 4-lane to just south of Vermillion St $3,300,000 2030 Scores higher as Non-NHS project; 0916-1038046
72 Hwy 33 Cloquet Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet $900,000 2029 0906-1038528
70 Hwy 18 Finlayson Resurface Hwy 18 in Finlayson to Hwy 23 $4,100,000 2031 5808-25
70 Hwy 23 Duluth Resurface Hwy 23 from Boyd St to I-35 $1,200,000 NA NA
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $1,800,000 2026 Listed as one project in CHIP: 6930-42
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $2,100,000 2026 Listed as one project in CHIP: 6930-42
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $500,000 2026 Listed as one project in CHIP: 6930-42
66 Hwy 1 Ely Resurface Hwy 1 from just west of St. Louis County Road 21 to Hwy 169 $1,100,000 NA NA
64 Hwy 61 Beaver Bay Resurface Hwy 61 from just south of Mary St to Beaver Bay bridge $400,000 NA NA
64 Hwy 1 Effie Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County Road 38 $300,000 NA NA
57 Hwy 73 Moose Lake Resurface Hwy 73 from just north of Moose Horn River to Hwy 27 $300,000 NA NA
54 Hwy 73 Kettle River Resurface Hwy 73 from Hwy 27 to 3rd Ave $2,900,000 2029 Coordinated with another project; 0912-1038575
50 Hwy 61 Duluth/London Road Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E.,  Pavement Resurface, Trail $100,000 2025 Limits included in 6925-145

Previous years

Score Route  Community Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
92 Hwy 61 Duluth/London Road Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E.,  Pavement Resurface, Trail $8,300,000 2025 Scored as NHS Pavement  6925-145
91 Hwy 11 International Falls Resurface Hwy 11 from just west of Koochiching County Road 332 to 6th Ave W in International Falls $5,200,000 2028 3605-43 
90 Hwy 33 Cloquet Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet $2,000,000 2029 0905-56
90 US2 Grand Rapids Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169 $3,800,000 2028 3103-1037794
85 Hwy 61 Two Harbors Reconstruct Hwy 61 from just north of the DM&IR railway bridge to just east of 5th St  $6,400,000 2025 3804-62
84 Hwy 23 Duluth Resurface Hwy 23 from McCuen St to Becks Rd/St. Louis County Road 3 $3,300,000 2031 6910-113
81 Hwy 38 Bigfork Hwy 38 South Limits Bigfork to 0.3 miles South Itasca County Road 14 Resurface roadway sidewalks improve pedestrian access  $2,500,000 2023 3108-83
80 Hwy 23 Duluth Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave $3,400,000 NA Cost is greater than available budget; also scored as Non-NHS pavement project
80 Hwy 194 Duluth/Central Entrance Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth $14,300,000 2026 6933-99
79 US2 Proctor Resurface Hwy 2 from Hwy 194 to just east of Boundary Ave in Proctor $10,800,000 2026 6908-68
79 US2 Warba Reconstruct Hwy 2 from just west of CR 73 to just west of CR 74 in Warba $4,000,000 2027 3104-63
76 US2 La Prairie/Grand Rapids Resurface EB and WB Hwy 2 in Grand Rapids to just east of La Prairie Ave

$3,300,000 2024 3104-61
73 US53 Cook Resurface Hwy 53 from just south of Cook to south limits of Cook $800,000 NA NA
73 Hwy 210 Carlton Resurface Hwy 210 from the end of the 4-lane to just south of Vermillion St $3,300,000 2030 Scores higher as Non-NHS project; 0916-1038046
72 Hwy 33 Cloquet Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet $900,000 2029 0906-1038528
70 Hwy 18 Finlayson Resurface Hwy 18 in Finlayson to Hwy 23 $4,100,000 2031 5808-25
70 Hwy 23 Duluth Resurface Hwy 23 from Boyd St to I-35 $1,200,000 NA NA
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $1,800,000 2026 Listed as one project in CHIP: 6930-42
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $2,100,000 2026 Listed as one project in CHIP: 6930-42
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $500,000 2026 Listed as one project in CHIP: 6930-42
66 Hwy 1 Ely Resurface Hwy 1 from just west of St. Louis County Road 21 to Hwy 169 $1,100,000 NA NA
64 Hwy 61 Beaver Bay Resurface Hwy 61 from just south of Mary St to Beaver Bay bridge $400,000 NA NA
64 Hwy 1 Effie Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County Road 38 $300,000 NA NA
57 Hwy 73 Moose Lake Resurface Hwy 73 from just north of Moose Horn River to Hwy 27 $300,000 NA NA
54 Hwy 73 Kettle River Resurface Hwy 73 from Hwy 27 to 3rd Ave $2,900,000 2029 Coordinated with another project; 0912-1038575
50 Hwy 61 Duluth/London Road Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E.,  Pavement Resurface, Trail $100,000 2025 Limits included in 6925-145

Score Route  Community Year Planned (FY) Description High Level Cost Estimate for Planning Purposes  Comments
91 Hwy 11 International Falls 2028 Resurface Hwy 11 from just west of CR 332 to 6th Ave W in International Falls $5,111,000 3605-43
90 Hwy 33 Cloquet 2029 Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet $1,923,000 0905-56
90 US2 Grand Rapids 2031 Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169 and intersection improvements at Hwy 2 and 7th Ave SE/8th Ave NE in Grand Rapids $8,325,000 3103-71
85 Hwy 61 TWO HARBORS 2025 In Two Harbors, reconstruct Hwy 61 from the southwest of Lake County Rd 61 to Park Rd. $17,100,000 3804-62
84 Hwy 23 Duluth 2031 Resurface Hwy 23 from McCuen St to Becks Rd/CR 3 $3,310,000 6910-113
81 Hwy 38 BIGFORK 2023 Hwy 38 South Limits Big Fork to 0.3 miles South  County Rd 14 Resurface roadway, sidewalks, improve pedestrian access $2,800,000 3108-83
80 Hwy 194 Duluth 2027 Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth $14,300,000 6933-99
80 Hwy 23 Duluth Not Selected Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave $3,400,000 Cost is greater than available budget; also scored as Non-NHS pavement project
79 US2 Warba 2027 Reconstruct Hwy 2 from just west of CR 73 to just west of CR 74 in Warba $4,000,000 3104-63
79 US2 Proctor 2026 Resurface Hwy 2 from Hwy 194 to just east of Midway rd (CSAH13) $10,750,000 6908-68
76 US2 GRAND RAPIDS 2024 Resurface EB and WB Hwy 2 in Grand Rapids from Jct Hwy 169 to just east of Gunn Rd in  La Prairie. $3,000,000 3104-61
73 Hwy 210 Carlton 2031 Resurface Hwy 210 from just east of CR 61 in Carlton to Hwy 23 in Duluth $7,986,000 0910-36
73 US53 Cook Not Selected Resurface Hwy 53 from just south of Cook to south limits of Cook $800,000
72 Hwy 33 Cloquet 2029 Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet $832,000 0906-1038528
70 Hwy 18 Finlayson 2032 Resurface Hwy 18 in Finlayson to Hwy 23 $4,205,000 5808-25
70 Hwy 23 Duluth Not Selected Resurface Hwy 23 from Boyd St to I-35 $1,200,000
70 Hwy 73 Chisholm 2027 Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $5,500,000 6930-42
66 Hwy 1 Ely Not Selected Resurface Hwy 1 from just west of St. Louis County Road 21 to Hwy 169 $1,100,000
64 Hwy 1 Effie Not Selected Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County Road 38 $300,000
57 Hwy 73 Moose Lake Not Selected Resurface Hwy 73 from just north of Moose Horn River to Hwy 27 $300,000
54 Hwy 73 Kettle River 2029 Resurface Hwy 73 from Hwy 27 to 3rd Ave in Kettle River $2,942,000 0912-40
49 Hwy 217 Littlefork 2030 Resurface Hwy 217 in Littlefork $3,115,000 3614-24

 

Score Route  Community Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
92 Hwy 61 Duluth/London Road Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E.,  Pavement Resurface, Trail $8,300,000 2025 Scored as NHS Pavement  6925-145
91 Hwy 11 International Falls Resurface Hwy 11 from just west of Koochiching County Road 332 to 6th Ave W in International Falls $5,200,000 2028 3605-43 
90 Hwy 33 Cloquet Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet $2,000,000 2029 0905-56
90 US2 Grand Rapids Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169 $3,800,000 2028 3103-1037794
85 Hwy 61 Two Harbors Reconstruct Hwy 61 from just north of the DM&IR railway bridge to just east of 5th St  $6,400,000 2025 3804-62
84 Hwy 23 Duluth Resurface Hwy 23 from McCuen St to Becks Rd/St. Louis County Road 3 $3,300,000 2031 6910-113
81 Hwy 38 Bigfork Hwy 38 South Limits Bigfork to 0.3 miles South Itasca County Road 14 Resurface roadway sidewalks improve pedestrian access  $2,500,000 2023 3108-83
80 Hwy 23 Duluth Resurface Hwy 23 from Becks Rd/St. Louis County Road 3 to just south of 83rd Ave $3,400,000 NA Cost is greater than available budget; also scored as Non-NHS pavement project
80 Hwy 194 Duluth/Central Entrance Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth $14,300,000 2026 6933-99
79 US2 Proctor Resurface Hwy 2 from Hwy 194 to just east of Boundary Ave in Proctor $10,800,000 2026 6908-68
79 US2 Warba Reconstruct Hwy 2 from just west of CR 73 to just west of CR 74 in Warba $4,000,000 2027 3104-63
76 US2 La Prairie/Grand Rapids Resurface EB and WB Hwy 2 in Grand Rapids to just east of La Prairie Ave

$3,300,000 2024 3104-61
73 US53 Cook Resurface Hwy 53 from just south of Cook to south limits of Cook $800,000 NA NA
73 Hwy 210 Carlton Resurface Hwy 210 from the end of the 4-lane to just south of Vermillion St $3,300,000 2030 Scores higher as Non-NHS project; 0916-1038046
72 Hwy 33 Cloquet Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet $900,000 2029 0906-1038528
70 Hwy 18 Finlayson Resurface Hwy 18 in Finlayson to Hwy 23 $4,100,000 2031 5808-25
70 Hwy 23 Duluth Resurface Hwy 23 from Boyd St to I-35 $1,200,000 NA NA
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $1,800,000 2026 Listed as one project in CHIP: 6930-42
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $2,100,000 2026 Listed as one project in CHIP: 6930-42
70 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $500,000 2026 Listed as one project in CHIP: 6930-42
66 Hwy 1 Ely Resurface Hwy 1 from just west of St. Louis County Road 21 to Hwy 169 $1,100,000 NA NA
64 Hwy 61 Beaver Bay Resurface Hwy 61 from just south of Mary St to Beaver Bay bridge $400,000 NA NA
64 Hwy 1 Effie Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County Road 38 $300,000 NA NA
57 Hwy 73 Moose Lake Resurface Hwy 73 from just north of Moose Horn River to Hwy 27 $300,000 NA NA
54 Hwy 73 Kettle River Resurface Hwy 73 from Hwy 27 to 3rd Ave $2,900,000 2029 Coordinated with another project; 0912-1038575
50 Hwy 61 Duluth/London Road Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E.,  Pavement Resurface, Trail $100,000 2025 Limits included in 6925-145

Score Route  Community Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
90 US2 Grand Rapids Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169 $3,600,000 2029 NA
90 Hwy 33 Cloquet Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet $1,600,000 2027 NA
86 Hwy 11 International Falls Resurface Hwy 11 from just west of Koochiching County Road 332 to 6th Ave W $4,000,000 2027 NA
85 Hwy 61 Duluth Resurface NB and SB Hwy 61 from 28th Ave E to 60th Ave E in Duluth $3,100,000 2025 Scored as NHS pavement (scored 92)
85 Hwy 61 Two Harbors Reconstruct Hwy 61 from just north of the DM&IR railway bridge to just east of 5th St  $6,600,000 2025 NA
82 US53 Orr Resurface Hwy 53 from Little Fork River bridge to just north of Saint Louis County Road 901 $4,700,000 Not Selected Not a district priority. Will continue to monitor pavement performance.
80 Hwy 194 Duluth Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth $12,800,000 2026 NA
79 US2 Warba Reconstruct Hwy 2 from 3rd Ave to the Swan River bridge in Warba $4,000,000 2027 NA
78 US2 Proctor Resurface Hwy 2 from Hwy 194 to just east of Boundary Ave in Proctor $10,900,000 2026 NA
78 Hwy 23 Duluth Resurface Hwy 23 from McCuen St to Becks Rd/Saint Louis County Road 3 $3,000,000 2029 NA
76 US2 La Prairie/Grand Rapids Resurface EB and WB Hwy 2 in Grand Rapids to just east of La Prairie Ave

$1,900,000 2024 NA
76 US2 Deer River Resurface Hwy 2 from 1st St SW to just east of Deer River $200,000 Not Selected Further analysis needed of issues
75 Hwy 23 Duluth Resurface Hwy 23 from Boyd St to I-35 in Duluth $3,400,000 Not Selected NA
72 Hwy 33 Cloquet Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet $700,000 2027 NA
70 Hwy 73 Chisholm Resurface Hwy 73 from where Hwy 73 turns left to 13th St NW in Chisholm $1,800,000 2026 Three segments for one project, due to type of pavement
70 Hwy 18 Finlayson Resurface Hwy 18 in Finlayson to Hwy 23 $1,100,000 Not Selected NA
69 Hwy 73 Chisholm Resurface NB and SB Hwy 73 from just north of Hwy 169 to 4th St in Chisholm $2,200,000 2026 Three segments for one project, due to type of pavement
69 Hwy 210 Carlton Resurface Hwy 210 from the end of the 4-lane to just south of Vermillion St in Carlton $2,800,000 2028 Scores higher as Non-NHS project
66 Hwy 1 Ely Resurface Hwy 1 from just west of Saint Louis County Road 21 to Hwy 169 in Ely $400,000 Not Selected NA
64 Hwy 61 Beaver Bay Resurface Hwy 61 from just south of Mary St to Beaver Bay bridge  $200,000 Not Selected NA
64 Hwy 1 Effie Resurface Hwy 1 from just west of Hwy 38 to just north of Itasca County Road 38 in Effie $200,000 Not Selected NA
61 Hwy 38 Bigfork Hwy 38 South Limits Bigfork to 0.3 miles South Itasca County Road 14 Resurface roadway sidewalks improve pedestrian access

$2,600,000 2023 Selected prior to policy (in 2019-2028 CHIP)
57 Hwy 73 Moose Lake Resurface Hwy 73 from just north of Moose Horn River to Hwy 27 in Moose Lake $200,000 Not Selected NA
54 Hwy 73 Kettle River Resurface Hwy 73 from Hwy 27 to 3rd Ave in Kettle River $2,800,000 2028 Coordinated with another project
49 Hwy 27 Moose Lake Reconstruct Hwy 27 from Kenwood Ave to Carlton County Road 61 in Moose Lake $3,200,000 Not Selected NA
49 Hwy 217 Littlefork Resurface Hwy 217 in Littlefork $2,100,000 2025 Selected prior to policy (in 2019-2028 CHIP)
42 Hwy 73 Chisholm Concrete pavement repair on Hwy 73 from 4th St in Chisholm to where Hwy 73 turns left $600,000 2026 Three segments for one project, due to type of pavement
39 Hwy 33 Cloquet Resurface Hwy 33 from bridge 09008 over St Louis River to just north of Carlton County Road 116 in Cloquet $500,000 Not Selected NA
30 Hwy 61 Duluth Resurface Hwy 61 from 26th Ave E to 28th Ave E in Duluth $100,000 Not Selected NA

 

Score Community Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
90 Duluth Hwy 194 Reconstruction from Anderson Road to Arlington Ave $18,000,000 2026 Part of Central Entrance project
90 Grand Rapids US2 Medium mill and overlay from Itasca County Road 62 to Highway 169 $15,000,000 2027 Listed as two projects in the CHIP
86 International Falls Hwy 11 Medium mill and overlay from Highway 332 to 6th Ave $6,200,000 2027 Listed as three projects in the CHIP
85 Two Harbors Hwy 61 Reconstruction from from Railroad Bridge to 5th St $8,700,000 2025 NA
85 Duluth Hwy 61 Medium mill and overlay from 28th ave to 40th St $5,400,000 2026 NA
85 Duluth Hwy 61 Medium mill and overlay from 40th Ave to 60th Ave $6,700,000 2027 NA
83 Aitkin Hwy 210 Medium mill and overlay from Highway 169  to Ripple River Bridge $1,400,000 2028 NA
80 Cloquet Hwy 33 Reclaim and overlay from Doddridge Ave to Cloquet Ave $1,500,000 2025 NA
80 Duluth Hwy 194 Medium mill and overlay from Highway 53 to Mesaba Ave $2,400,000 2026 Part of Central Entrance project
78 Proctor US2 Reclaim and overlay from Highway 194 to Boundary Ave $11,000,000 2025 NA
77 Orr US53 Medium mill and overlay from Little Fork River Bridge to St. Louis County Road 901 $9,400,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
76 La Prairie/Grand Rapids US2 Medium mill and overlay from Highway 169 to 0.4 miles east of railroad bridge $2,500,000 2024 NA
76 Deer River US2 Medium mill and overlay from 1st St to Deer River $300,000 Not Selected In District 2 construction area, but was not on the District 2 priority list 
75 Duluth Hwy 23 Medium mill and overlay from Hulett Ave to I-35 $3,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
70 Chisholm Hwy 73 Medium mill and overlay from Highway 73 to 13th St $800,000 2026 Selected prior to policy (in 2019-2028 CHIP), listed as two projects in the CHIP
70 Big Falls US71 Medium mill and overlay in Big Falls $400,000 Not Selected
70 Aitkin US169 Full mill and replace from Highway 47 to Highway 210 $400,000 Not Selected
69 Chisholm Hwy 73 Medium mill and overlay from Highway 169 to 4th St $1,700,000 2025 Coordinated with other Chisholm project for continuity and timing
69 Carlton Hwy 210 Medium mill and overlay from I-35 to Vermillion St $4,800,000 2029 Selected prior to policy (in 2019-2028 CHIP)
69 Cloquet Hwy 33 Medium mill and overlay from St Louis River to Carlton County Rd 116 $1,800,000 Not Selected
66 Ely Hwy 1 Medium mill and overlay from Carlton County Highway 21 to Highway 169 $900,000 Not Selected
65 Finlayson Hwy 18 Medium mill and overlay from Finlayson to Highway 23 $2,200,000 2029 Selected prior to policy (in 2019-2028 CHIP)
64 Grand Rapids Hwy 38 Medium mill and overlay from Highway 2 to 17th St NW $600,000 Not Selected
64 Effie Hwy 1 Thick mill and overlay from 200 feet west of Highway 38 to 0.41 miles north of Itasca County Highway 38 $300,000 Not Selected
64 Beaver Bay Hwy 61 Medium mill and overlay from Mary St to Beaver Bay bridge $400,000 Not Selected
61 Bigfork Hwy 38 Full mill and replace from Big Fork to Highway 38 $600,000 2023 Selected prior to policy (in 2019-2028 CHIP)
58 Moose Lake Hwy 73 Medium mill and overlay from Moose Horn River to Highway 27 $300,000 Not Selected
57 Cloquet Hwy 33 Medium mill and overlay from Cloquet Ave to St. Louis River $700,000 2025 Coordinated with larger NHS /Urban pavement project
54 Kettle River Hwy 73 Medium mill and overlay from Highway 27 to 3rd Ave $1,500,000 2029 Coordinated with another project
49 Littlefork Hwy 217 Reclaim and reconstruct from Highway 65 to Front St $1,200,000 2025 Selected prior to policy (in 2019-2028 CHIP)
49 Moose Lake Hwy 27 Reconstruction from Moose Lake/Kenwood Ave to Carlton County Road 61 $6,300,000 Not Selected
42 Chisholm Hwy 73 Major Concrete pavement rehabilitation from 4th St to where Highway 73 turns left $100,000 2026 Coordinated with other Chisholm project for continuity and timing
30 Duluth Hwy 61 Minor Concrete pavement repair from 26th Ave to 28th Ave $100,000 Not Selected