Route (Hwy or Interstate) |
Description |
Begin date |
End date |
Total cost |
2025 construction cost |
Website |
Hwy 3 |
Construct Hwy 3 roundabout at 142nd St/Rosemount High School entrance; improve accessibility and drainage |
June 2025 |
August 2025 |
$1.8 million |
$1.8 million |
mndot.gov/metro/projects/hwy3rosemount |
Hwy 5 |
Expand Highway 5 to four-lanes from Hwy 41 in Chanhassen to 80th St in Victoria; improve intersections; improve safety for pedestrians and bicyclists (led by Carver County) |
Fall 2025 |
Fall 2027 |
94.6 million |
$5.5 million |
carvercountymn.gov/departments/public-works/projects-studies/highway-5-improvements |
Hwy 5 |
Landscape along Hwy 5 from East 7th St in St Paul to McKnight Rd in Maplewood |
April 2025 |
June 2026 |
$262,000 |
$262,000 |
mndot.gov/metro/projects/hwy5stpaul-maplewood |
Hwy 10 |
Construct new interchanges on Hwy 10 at Ramsey Blvd and Sunfish Lake Blvd including bridges over the railroad tracks. Build a frontage road between Ramsey Blvd and Sunfish Lake Blvd (Anoka County-led project) |
Spring 2025 |
Fall 2025 |
$4 million |
$500,000 |
anokacountymn.gov/3918/Hwy-10Ramsey-Blvd-Interchange |
Hwy 10 |
Landscape Hwy 10 from Ferry St to railroad bridge in Anoka |
August 2024 |
July 2027 |
$130,000 |
$20,000 |
None |
Hwy 10 |
Landscape along Hwy 10 from Ferry St to bridge over railroad tracks in Anoka (following the Hwy 10-Rum River/Ferry St interchange project) |
August 2024 |
July 2027 |
$130,000 |
$130,000 |
mndot.gov/metro/projects/hwy10-anoka |
Hwy 10 |
Construct additional lane on Hwy 10 from CR 78 to CR9 in Coon Rapids; repave existing road and construct noise walls |
April 2025 |
June 2026 |
$39.7 million |
$35 million |
mndot.gov/metro/projects/hwy10coonrapids |
Hwy 13 |
Landscape Hwy 13 at Dakota Ave, Yosemite Ave and Vernon Ave in Savage |
July 2025 |
November 2027 |
$125,000 |
$125,000 |
None |
Hwy 20 |
Resurface Hwy 20 from River Road in Cannon Falls to the Goodhue-Dakota county line |
September 2025 |
September 2025 |
$822,000 |
$822,000 |
None |
I-35 |
Install traffic management system on I-35 from CR 22 in Wyoming to the Pine/Chisago County line north of Rush City |
August 2024 |
June 2025 |
$2 million |
$37,000 |
None |
I-35 |
Install traffic management system on I-35 from CR 46 in Lakeville to 260th St in Elko-New Market |
July 2025 |
September 2025 |
$1 million |
$1 million |
None |
I-35E |
Reconstruct I-35E and CR J interchange in Blaine and Shoreview (Ramsey County-led project) |
Summer 2025 |
Fall 2026 |
$11.25 million |
$8 million |
ramseycounty.us/residents/roads-transportation/future-road-projects/future-road-construction-projects/county-road-j-i-35e-interchange |
I-35W |
Landscape I-35W from 26th Ave to 31st St in Mpls |
June 2023 |
November 2025 |
$514,000 |
$45,000 |
None |
I-35W |
Landscape I-35W from Park Ave to 26th St in Mpls |
April 2023 |
November 2025 |
$822,000 |
$120,000 |
None |
I-35W |
Landscape I-35W from CR C in Roseville to Sunset Ave in Blaine |
August 2023 |
June 2026 |
$343,000 |
$117,000 |
None |
I-35W, Hwy 13 |
Repave I-35W from Cliff Rd to the Burnsville split in Burnsville; repair or replace bridges at Cliff Rd, Hwy 13 and Burnsville Pkwy; update guardrail and improve drainage |
April 2025 |
October 2026 |
$71.5 million |
$40 million |
mndot.gov/metro/projects/i35wburnsville |
I-35W, I-494 |
Reconstruct I-35W/494 interchange; repair, replace and repair bridges from East Bush Lake Rd in Edina to 12th Ave in Richfield, build pedestrian bridge, add E-ZPass lanes, construct noise walls, repair pavement |
March 2023 |
November 2026 |
$377 million |
$100 million |
mndot.gov/metro/projects/i494edina-richfield |
Hwy 36 |
Resurface Hwy 36 from I-35W in Roseville to Edgerton St in Maplewood/Little Canada; extend auxiliary lane; guardrail replacement; accessibility improvements; reconstruct I-35W southbound/Cleveland Ave to eastbound Hwy 36 ramp |
June 2024 |
May 2025 |
$17 million |
$4.5 million |
mndot.gov/metro/projects/hwy36roseville-littlecanada |
Hwy 36, Hwy 5 |
Resurface Hwy 5 (E 7th St and Stillwater Rd) from Mendota St in St Paul to the north junction of Hwy 120 in Maplewood; repair or replace drainage, make safety and accessibility improvements |
August 2023 |
June 2025 |
$13.6 million |
$3.2 million |
mndot.gov/metro/projects/hwy5stpaul-maplewood |
Hwy 41 |
Construct roundabout at Hwy 41 and CR 10 in Chaska as part of the CR 10 improvement project (Carver County-led project) |
Fall 2024 |
Fall 2025 |
$2.85 million |
$2.85 million |
carvercountymn.gov/departments/public-works/projects-studies/highway-10-41-project |
Hwy 41 |
Construct Hwy 41 roundabout at entrance to Minnetonka Middle School West in Chanhassen |
June 2025 |
September 2025 |
$950,000 |
$950,000 |
chanhassenmn.gov/government/projects/state-highway-projects/th41-minnetonka-middle-school-west-intersection-improvements |
Hwy 47 |
Repair or replace drainage on Hwy 47 from Mississippi St NE in Fridley to University Ave NE in Blaine; install pedestrian safety improvements |
July 2025 |
August 2025 |
$1.12 million |
$1.12 million |
None |
Hwy 51 |
Resurface Hwy 51 (Snelling Ave) between Grand Ave and St Clair Ave in St Paul; accessibility improvements |
July 2024 |
October 2025 |
$3.5 million |
$1 million |
mndot.gov/metro/projects/snellingave-stpaul |
Hwy 52 |
Redeck and repaint Hwy 52 bridge over I-494 in Inver Grove Heights |
April 2025 |
October 2025 |
$11.1 million |
$11 million |
mndot.gov/metro/projects/hwy52invergroveheights |
Hwy 52, I-35E, I-35, Hwy 212 |
Improve or replace four pedestrian bridges statewide, and improve accessibility. Locations include the bridges spanning Hwy 52 from Lewis St to Stickney Ave in South St Paul; I-35E from Pleasant Ave to Thompson St in St Paul; Hwy 212 from DeSoto Ave to 5th St E in Glencoe; I-35 between Michigan Ave and Railroad St in Duluth |
April 2025 |
October 2026 |
$11.2 million |
$6 million |
None |
Hwy 52, I-494 |
Replace lighting on Hwy 52 (Lafayette Bridge) in St Paul and I-494 (Wakota Bridge) in South St Paul and Newport |
April 2025 |
June 2025 |
$320,000 |
$320,000 |
None |
Hwy 55 |
Replace signals on Hwy 55 at Pleasant Dr and Westview Dr in Hastings; improve accessibility |
August 2025 |
October 2025 |
$1.5 million |
$1.5 million |
mndot.gov/metro/projects/hwy55hastings |
Hwy 55 |
Resurface Hwy 55 from Old Rockford Rd in Plymouth to General Mills Blvd in Golden Valley; add J-turns; improve storm sewer; add pedestrian and bicycle connections; replace signal |
April 2024 |
June 2025 |
$19 million |
$1 million |
mndot.gov/metro/projects/hwy55plymouth-goldenvalley |
Hwy 55 |
Resurface Hwy 55 (Olson Memorial Pkwy) from Hwy 100 in Golden Valley to railroad tracks near North Thomas Ave in Mpls; construct trail and improve accessibility; install guardrail; reconstruct Hwy 55 turn lane at Dahlberg Dr |
July 2025 |
June 2026 |
$7.2 million |
$7 million |
mndot.gov/metro/projects/hwy55mpls-goldenvalley |
Hwy 61 |
Widen Hwy 61 from Frenchman Rd to Egg Lake Rd in Hugo to extend left turn lanes and replace culvert (Washington County-led project) |
Spring 2025 |
Fall 2025 |
$1.1 million |
$1.1 million |
washingtoncountymn.gov/TH61 |
Hwy 61, Hwy 5 |
Resurface Hwy 5 (E 7th St) and Hwy 61 (Arcade St) from I-94 to Minnehaha Ave in St Paul to Roselawn Ave in Maplewood; repair sidewalks; update curb ramps and driveways; update and improve pedestrian lighting, traffic signals and bus stops |
April 2025 |
October 2026 |
$33.3 million |
$18 million |
mndot.gov/metro/projects/e7th-arcade |
Hwy 62 |
Construct noise wall along WB Hwy 62 from just east of Gleason Rd to just west of Tracy Ave in Edina; add traffic management system |
January 2024 |
June 2025 |
$1.9 million |
$77,000 |
mndot.gov/metro/projects/standalonenoisebarrier |
Hwy 62 |
Build a 2,200-foot-long noise wall on the south side of Hwy 62 eastbound from Xerxes Ave to Russell Ave in Richfield; remove trees |
March 2025 |
August 2025 |
$6.5 million |
$6.5 million |
mndot.gov/metro/projects/standalonenoisebarrier |
Hwy 62 |
Repair Bloomington Ave bridge over Hwy 62 in Minneapolis |
March 2025 |
May 2025 |
$515,000 |
$515,000 |
mndot.gov/metro/projects/bloomingtonavempls |
Hwy 65 |
Replace or repair bridges on Hwy 65 from CR 10 in Spring Lake Park to 237th Ave in East Bethel; repair pavement; replace signals and cable median barriers |
April 2024 |
July 2025 |
$33.2 million |
$3.6 million |
mndot.gov/metro/projects/hwy65slp-eastbethel |
I-94 |
Build and replace accessible pedestrian sidewalks and ramps at the I-94 Elm Creek Rest Area in Maple Grove |
May 2024 |
May 2027 |
$855,000 |
$20,000 |
None |
I-94 |
Landscape I-94 from Williams Ave to Warwick St in Mpls |
April 2023 |
June 2025 |
$174,000 |
$20,000 |
None |
I-94 |
Repair 5 bridges on I-94 from Hwy 55/Hiawatha Ave to East River Pkwy/Franklin Ave SE in Mpls; construct temporary construction crossovers and guardrail |
October 2024 |
November 2025 |
$15.9 million |
$14.5 million |
mndot.gov/metro/projects/i94minneapolis |
I-94 |
Repair 9 bridges, including the John Ireland Blvd bridge, on I-35E from 10th St to Jackson St, and on I-94 from Western Ave to Mounds Blvd in St Paul; paint 2 bridges; and replace supports on 2 bridges |
June 2025 |
September 2026 |
$17 million |
$7 million |
None |
I-94 |
Repair I-94 and Marion St bridge in St. Paul; replace signals and improve accessibility |
May 2025 |
November 2025 |
$2.3 million |
$2.3 million |
None |
I-94 |
Repair I-94 bridges over St Croix River in Lakeland and Hudson, Wis. (Wisconsin DOT-led project) |
June 2025 |
September 2026 |
$4.5 million |
$4.5 million |
wisconsindot.gov/Pages/projects/by-region/nw/i94stcroixbridges/default.aspx |
I-94 |
Modify I-94 eastbound exit ramp intersection at Radio Dr in Woodbury; improve pedestrian connections and install new signals |
August 2025 |
October 2025 |
$297,000 |
$297,000 |
None |
Hwy 95 |
Add left turn lanes on Hwy 95 at 392nd St in North Branch |
April 2025 |
August 2025 |
$1.83 million |
$1.83 million |
mndot.gov/metro/projects/hwy95northbranch |
Hwy 97 |
Reconstruct Hwy 97 from I-35 to Hwy 61 in Forest Lake; add trail along south side of road; build roundabout at Fenway Ave; construct turn lanes, median island, drainage pipes and ponds |
June 2025 |
October 2026 |
$15.9 million |
$7 million |
mndot.gov/metro/projects/hwy97-forestlake |
Hwy 100 |
Resurface Hwy 100 from W 26th St in St Louis Park to just south of Hwy 55 at the railroad bridge overpass in Golden Valley |
June 2025 |
August 2025 |
$1.2 million |
$1.2 million |
None |
Hwy 101 |
Resurface 2 miles of Hwy 101 from Hwy 5 in Chanhassen to CR 62 in Eden Prairie; add trail connections; reconstruction trail; install pedestrian signals; improve accessibility; repair shoulders and improve drainage. |
July 2024 |
June 2025 |
$1.9 million |
$1.9 million |
mndot.gov/metro/projects/hwy101chanhassen-edenprairie |
Hwy 121 |
Reduce Hwy 121 and Lyndale Ave/CR 22 to one lane in both directions from Hwy 62 to 56th St in Minneapolis; adjust concrete island dimensions at Hwy 62 ramp; remove and replace guardrail; improve drainage; improve accessibility and replace signals at 58th St intersection |
May 2025 |
October 2025 |
$3.1 million |
$3.1 million |
mndot.gov/metro/projects/hwy121-lyndaleavempls |
Hwy 149 |
Reconstruct Smith Ave and Bernard St near Hwy 149 intersection in West St Paul; add new traffic signal, sidewalks and turn lanes; establish memorial location for Police Officer Scott Patrick (led by city of West St. Paul) |
April 2025 |
September 2025 |
$3.8 million |
$3.8 million |
wspmn.gov/989/Smith-AveDodd-Rd-Intersection-Improvemen |
Hwy 149, Hwy 3, Hwy 13 |
Upgrade signals with flashing yellow arrow on Hwy 3 at Red Pine Lane; Hwy 13 at Black Hawk Rd and Yankee Doodle Rd; Hwy 149 at Wescott Rd, Opperman Rd and Yankee Doodle Rd in Eagan; make accessibility improvements |
June 2025 |
June 2025 |
$381,000 |
$381,000 |
None |
Hwy 169 |
Paint new 36th Ave Bridge over Hwy 169 in Plymouth |
June 2024 |
June 2025 |
$5.15 million |
$20,000 |
mndot.gov/metro/projects/36thaveplymouth |
Hwy 169 |
Replace signals at Hwy 169 and Betty Crocker Dr in Golden Valley and Plymouth; improve accessibility; add a new pedestrian and bike lane |
August 2025 |
October 2025 |
$1.79 million |
$1.79 million |
mndot.gov/metro/projects/hwy169plymouth-goldenvalley |
Hwy 169 |
Construct Bluff Drive overpass on Hwy 169 in Sand Creek Township (Scott County-led project) |
October 2024 |
Fall 2025 |
$640,000 |
$40,000 |
scottcountymn.gov/2013/Highway-169-Bluff-Drive-Jordan-Ave-Overp |
Hwy 169 |
Remove Hwy 169 access at 173rd St and Jordan Ave in Sand Creek Township; construct frontage road between 173rd St and Jordan Ave |
June 2025 |
October 2025 |
$540,000 |
$540,000 |
None |
Hwy 169, Hwy 282 |
Construct interchange with two bridges at Hwy 169/282/CR9; build two roundabouts, pedestrian tunnel, sidewalks, retaining walls and noise walls |
February 2025 |
May 2028 |
$62.5 million |
$14.5 million |
mndot.gov/metro/projects/hwy169-hwy282jordan |
Hwy 212 |
Modernize and expand Hwy 212 from 2 lanes to 4 lanes from CR 34 to CR 36 in Benton Township |
July 2024 |
Fall 2026 |
$27.65 million |
$500,000 |
carvercountymn.gov/departments/public-works/projects-studies/highway-212-project-benton-township |
Hwy 212, Hwy 5 |
Repair concrete on Hwy 5 and Hwy 212 from Eden Prairie Rd to I-494 in Eden Prairie; pave shoulders and update existing guardrail. |
June 2025 |
September 2025 |
$6.7 million |
$6.7 million |
mndot.gov/metro/projects/hwy212-hwy5edenprairie |
Hwy 316 |
Resurface pavement on Hwy 316 from the south junction of Hwy 61 in Welch Township to Tuttle Dr. in Hastings; build turn lanes at various locations on Hwy 316 in Ravenna Township |
May 2025 |
October 2025 |
$7.61 million |
$7.6 million |
mndot.gov/metro/projects/hwy316hastings-welchtwp |
I-394 |
Extend and add acceleration/deceleration lane on I-394 between Pennsylvania Ave and Dakota Ave in St Louis Park; repair bridge, modify intersections; replace signals; improve accessibility |
July 2025 |
June 2026 |
$8.2 million |
$8 million |
mndot.gov/metro/projects/i394stlouispark |
I-394, I-94 |
Repair 34 bridges and ramps on I-394 between Penn Ave and 11th St N in Minneapolis and I-94 between Glenwood Ave and I-394 in Minneapolis; realign I-394 to Dunwoody Blvd ramp; improve accessibility, lighting, sidewalks and drainage |
July 2025 |
November 2026 |
$78.6 million |
$7 million |
mndot.gov/metro/projects/i94-i394minneapolis |
I-394 |
Replace I-394 signs from I-494 in Minnetonka to Hwy 169 in Golden Valley |
April 2025 |
June 2025 |
$896,000 |
$896,000 |
None |
I-494 |
Replace traffic signs on I-494 from Hwy 77 in Richfield/Bloomington to Argenta Trail/Delaware Ave in Eagan/Mendota Heights |
June 2025 |
August 2025 |
$1.2 million |
$1.2 million |
None |
I-494 |
Repair bridge and pavement on I-494 over Minnesota River from 24th Ave in Bloomington to Pilot Knob Rd in Mendota Heights/Eagan; replace highway lighting, reconstruct regional trail |
April 2023 |
August 2025 |
$62.17 million |
$23 million |
mndot.gov/metro/projects/i494mnriverbridge |
Hwy 610 |
Construct 4-lane Hwy 610 from CR 30 to Maple Grove Pkwy in Maple Grove; connect across I-94 to Hwy 610; ramps to I-94 eastbound and from I-94 westbound to Hwy 610 (city of Maple Grove-led project) |
April 2024 |
September 2026 |
$19.2 million |
$3 million |
610extensionproject.com |
I-694 |
Repair drainage of I-694 eastbound to I-35E southbound ramp in Little Canada; replace guardrail; repave shoulder |
June 2025 |
June 2025 |
$286,000 |
$286,000 |
None |
Stillwater Lift Bridge |
Repair electric cables on Stillwater Lift Bridge in Stillwater |
October 2025 |
December 2025 |
$2.3 million |
$2.3 million |
mndot.gov/stillwaterliftbridge |
Stone Arch Bridge |
Repair Stone Arch Bridge in Mpls; replace and repair stones |
January 2024 |
October 2025 |
$38.5 million |
$13.2 million |
mndot.gov/metro/projects/stonearchbridge |
Various Hwys in MnDOT Metro District |
Replace traffic signal loops at various locations |
July 2025 |
October 2025 |
$75,000 |
$75,000 |
None |
Various Hwys in MnDOT Metro District |
Replace overhead sign structures and modify or replace traffic barriers at various locations |
August 2024 |
July 2025 |
$2 million |
$2 million |
None |
Various Hwys in MnDOT Metro District |
Replace traffic signal cabinets at various locations |
September 2024 |
June 2025 |
$300,000 |
$155,000 |
None |
Various Hwys in MnDOT Metro District |
Replace overhead sign panel mounting clip hardware at various locations |
June 2025 |
June 2028 |
$2 million |
$2 million |
None |
Various Hwys in MnDOT Metro District |
Install replacement generators and replace failing shelters at various locations |
August 2025 |
November 2025 |
$1 million |
$1 million |
None |
Various Hwys in MnDOT Metro District |
Pond preservation at various locations |
October 2024 |
June 2026 |
$4.5 million |
$3.5 million |
None |
Various Hwys in MnDOT Metro District |
Replace overhead sign structures at various locations |
July 2025 |
June 2026 |
$4.2 million |
$2.1 million |
None |
Various Hwys in MnDOT Metro District |
Fill in cameras for traffic management system at various locations |
August 2025 |
May 2026 |
$800,000 |
$600,000 |
None |
Various Hwys in MnDOT Metro District |
Bridge deck flood sealing at various locations |
June 2025 |
February 2027 |
$4 million |
$1.5 milliion |
None |
Various Hwys in MnDOT Metro District |
Replace dynamic message signs at various locations |
June 2025 |
August 2025 |
$925,000 |
$925,000 |
None |
Various Hwys in MnDOT Metro District |
Replace traffic detector loops at various locations |
July 2024 |
June 2025 |
$75,000 |
$75,000 |
None |
Various Hwys in MnDOT Metro District |
Replace traffic signal loops at various locations |
July 2025 |
June 2026 |
$50,000 |
$50,000 |
None |