About this project
Starting in 2025, Hwy 97 between I-35 and Hwy 61 in Forest Lake will undergo a pavement reconstruction project. As part of the work, various safety and pedestrian improvements are being considered including raised median islands, a multi-use trail and other pedestrian improvements. The proposed trail along the south side of Hwy 97 would provide a safer place for pedestrians and bicyclists and also provide access to Hardwood Creek Trail.
Proposed summary of work
- Reconstruct roadway
- Construct a single-lane roundabout
- Construct multi-use trail
- Add raised median
- Upgrade pedestrian accessibility
- Repair/replace drainage