Hwy 87

Hubbard

About the project

Map of all three projects together
Map of three projects on Hwy 87 to take place in 2024 and 2025

Construction on Hwy 87 between Hwy 71 and Hwy 64 will take place in 2024 and 2025. It is split into three different sections, and each one has their own fix.

The center portion was completed in 2024, and the western/eastern sides in 2025.

Traffic impacts

  • Detour (map coming soon)

Western section (2025 construction)

Map showing the western project on Highway 87 between Highway 71 and  Hubbard
The western portion of the 2025 project on Hwy 87 is located between Hwy 71 and Hubbard

Hwy 71 to Hubbard

  • Urban reconstruct in Hubbard
  • Rural reconstruct, shoulder widening
  • Culvert replacement at Long Lake

Traffic impacts

  • Detour (in 2025)

Eastern section (2025 construction)

Map showing the eastern project on Highway 87 between Third Crow Wing Lake and Highway 64
The eastern portion of the 2025 project on Hwy 87 is located between Third Crow Wing Lake and Hwy 64

Third Crow Wing Lake to Hwy 64

  • Resurface

Traffic impacts

  • Detour (in 2025)